Carcoar Dam

Summary

Carcoar Dam is a minor ungated concrete double parabolic arch dam with an uncontrolled overflow spillway across the Belubula River upstream of Carcoar in the central west region of New South Wales, Australia. The dam's purpose includes irrigation, water supply, and water conservation.

Carcoar Dam
Carcoar Dam, 2007
Carcoar Dam is located in New South Wales
Carcoar Dam
The location of the Carcoar Dam
in New South Wales
LocationCarcoar, New South Wales, Australia
Coordinates33°37′00″S 149°10′45″E / 33.61667°S 149.17917°E / -33.61667; 149.17917
PurposeIrrigation, water supply, and water conservation
StatusOperational
Construction began1969
Opening date1970
Owner(s)State Water Corporation
Dam and spillways
Type of damArch dam
ImpoundsBelubula River
Height52 metres (171 ft)
Length187 metres (614 ft)
Dam volume61 cubic metres (2,200 cu ft)
Spillways1
Spillway typeUncontrolled overflow spillway
Spillway capacity1,218 cubic metres per second (43,000 cu ft/s)
Reservoir
Total capacity36,400 megalitres (1,290×10^6 cu ft)
Catchment area230 square kilometres (89 sq mi)
Surface area385 hectares (950 acres)
Maximum water depth41 metres (135 ft)
Normal elevation720 metres (2,360 ft) AHD
Website
Carcoar Dam at www.statewater.com.au

Location and features edit

Commenced in 1969 and completed in 1970, Carcoar Dam is a minor dam on the Belubula River, a tributary of the Lachlan River, within the Lachlan Valley, approximately 6 kilometres (3.7 mi) north of the village of Carcoar and south of the town of Blayney. Water from the dam is released directly into the Belubula River which is used by irrigators downstream of the dam, and for stock and domestic requirements along the Belubula River.[1]

The dam wall height is 57 metres (187 ft) and is 187 metres (614 ft) long. The maximum water depth is 41 metres (135 ft) and at 100% capacity the dam wall holds back 36,400 megalitres (1,290×10^6 cu ft) of water at 720 metres (2,360 ft) AHD. The surface area of the dam is 385 hectares (950 acres) and the catchment area is 230 square kilometres (89 sq mi). The dam uses a free-flowing spillway which is capable of discharging 1,218 cubic metres per second (43,000 cu ft/s).[2][3]

The dam is unusual in that its wall is not only curved from side-to-side but also from top to bottom.[4]

The dam is popular for water skiing, swimming, fishing windsurfing and sailing. Camping, picnic and barbecue facilities are available. Murray Cod, Golden Perch, Silver Perch and Rainbow Trout are all stocked fish in Carcoar Dam with Redfin present.[5]

Carcoar wetland edit

In the early 1990s, the NSW Government assisted to establish wetlands at Carcoar Dam in an effort to control blue-green algae which had made the dam unusable for recreation and made the water discharged from the dam unusable, even for domestic animals.[6] The purpose of the wetland was to act as a nutrient sink which could capture nutrients prior to them entering the reservoir.[7]

Gallery edit

See also edit

References edit

  1. ^ Green, D.; Petrovic, J.; Moss, P.; Burrell, M. (2011). Water resources and management overview: Lachlan catchment (PDF). Sydney: Government of New South Wales. ISBN 978-1-74263-185-1. {{cite book}}: |work= ignored (help)
  2. ^ "Carcoar Dam". Water delivery: Dams. State Water Corporation. Archived from the original on 11 April 2013. Retrieved 13 April 2013.
  3. ^ "Register of Large Dams in Australia". Dams information. The Australian National Committee on Large Dams Incorporated. 2010. Archived from the original (Excel (requires download)) on 12 December 2013. Retrieved 22 April 2013.
  4. ^ "Carcoar Dam" (PDF). State Water Corporation. 2009. Archived from the original (PDF brochure) on 20 March 2012. Retrieved 13 April 2013.
  5. ^ "Carcoar Dam". Blayney Shire Council. Retrieved 13 April 2013.
  6. ^ Cruickshank, Adrian; Causley, Ian (20 April 1993). "Carcoar Dam Wetland Experiment". Hansard. Parliament of New South Wales. Archived from the original (transcript) on 23 October 2012. Retrieved 13 April 2013.
  7. ^ "Water quality: Algal information: Prevention and control". Office of Water, Department of Primary Industries. Government of New South Wales. 15 August 2011. Archived from the original on 19 April 2013. Retrieved 13 April 2013.

External links edit