D-Cube City

Summary

D-Cube City (Korean디큐브시티) is a mega-complex in Seoul, Korea, which comprises department stores, office space, a park, an art center, a theatre, a hotel, restaurants, a theme park, and private residences.[1] Daeseong Industrial Company constructed in 2011, and its main office is located here. This mixed use facility was developed by the same groups that developed Roppongi Hills in Tokyo.[2]

D-Cube City
D Cube City view from Sindorim Station
Map
General information
TypeMixed-Use
Address360-45 Sindorim-dong, Guro-gu, Seoul, Republic of Korea
Town or citySeoul
CountrySouth Korea
Construction started2007
Completed2011
Opened2011
Cost1.3 trillion won
ClientDaesung Industrial Co., Ltd.
Technical details
Floor count51 Stories and 8 Basements
Floor area350,054 sq. meters
Design and construction
Architect(s)Samoo Architects & Engineers (Local Design/Executive/Residential Architect), The Jerde Partnership (Design Architects)
Other designersLandscape Architect: Oikos, Consultant: Mori Building Company
Main contractorDaesung Industrial Co., Ltd.
Awards and prizes2012 MIPIM Awards Finalist, Shopping Centre Category
Website
Official Website

Architecture edit

D-Cube City’s six acres of parks, plazas, and gardens are spread across the structure’s stepped roofs.[3] The steel and glass façade and open internal architecture provides an opportunity for the surrounding landscape to enter into the structure, both visually and literally as many stores open out onto the adjacent parks and gardens. Large atriums house many species of plants as well as internal water features and a six story waterfall. “Water flow” is one of the interior aesthetic themes.[4][5][6][7][8]

During construction, an endangered species of frog, Kaloula borealis was found on the site. After discovering that the proposed structure’s site was the frogs’ habitat, the designers recreated and incorporated a five billion won ecology park into the landscape design as a new habitat.[9]

Construction and sale edit

Daeseong Industries had to expand its business through construction, retail distribution and hotel business, but its financial structure quickly became insolvent.

Daeseong Industries had around 400 billion won in loans until 2007, but at the end of 2011, its debt rose to 278.8 trillion won due to the repayment of the D-CUBE City Construction Project Financing (PF) KRW 977 billion. Accordingly, it sold the D-cube office, D-cube hotel in 2012, and the D-cube department store in November 2014.

See also edit

References edit

  1. ^ "Building Stats".
  2. ^ "Building Developers".
  3. ^ "Landscape". Archived from the original on 2013-03-27. Retrieved 2012-07-13.
  4. ^ "Architecture 1". Archived from the original on 2012-10-20. Retrieved 2012-07-13.
  5. ^ "Architecture 2".
  6. ^ "Architecture 3". Archived from the original on 2013-03-27. Retrieved 2012-07-13.
  7. ^ "Architecture 4".
  8. ^ "Architecture 5".
  9. ^ "Endangered Frogs". Archived from the original on August 28, 2022.{{cite web}}: CS1 maint: unfit URL (link)

37°30′35″N 126°53′25″E / 37.509677°N 126.890336°E / 37.509677; 126.890336