Datunludong station[1] (simplified Chinese: 大屯路东站; traditional Chinese: 大屯路東站; pinyin: Dàtúnlù Dōng Zhàn) is an interchange station of Line 5 and Line 15 on the Beijing Subway.
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Beiyuan Road (北苑路) and Datun Road (大屯路) Chaoyang District, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (1 island platform and 2 side platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated (Line 5) Underground (Line 15) | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | October 7, 2007 December 26, 2015 (Line 15) | (Line 5)|||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
Datunludong Location in central Beijing |
The line 5 station opened on October 27, 2007. It was too small to handle the interchange between line 5 and 15, so the line 15 station was left unopened when the western extension was opened in December 2014. From October to December 2015, the line 5 station was closed to widen the station and build a transfer corridor.[2] The line 15 station opened on December 26, 2015,[3] one year later than the other stations on the line.
The line 5 station has 2 elevated side platforms. The line 15 station has an underground island platform.
There are 6 exits, lettered A1, B1, B2, G, H1, and H2. Exits A1, B1, and H1 are accessible.
40°00′14″N 116°25′03″E / 40.003841°N 116.417377°E