Dispatchable generation

Summary

Dispatchable generation refers to sources of electricity that can be programmed on demand at the request of power grid operators, according to market needs. Dispatchable generators may adjust their power output according to an order.[1] Non-dispatchable renewable energy sources such as wind power and solar photovoltaic (PV) power cannot be controlled by operators.[2] Other types of renewable energy that are dispatchable without separate energy storage are hydroelectric, biomass, geothermal and ocean thermal energy conversion.[3]

Grids with high penetration of renewable energy sources generally need dispatchable generation rather than baseload generation

Startup time edit

Dispatchable plants have varying startup times, depending on the technology used and time elapsed after the previous operation. For example, "hot startup" can be performed few hours after preceding shutdown, while "cold startup" is performed after a few days of inoperation.

The fastest plants to dispatch are grid batteries which can dispatch in milliseconds. Hydroelectric power plants can often dispatch in tens of seconds to minutes and natural gas power plants can generally dispatch in tens of minutes.

For example, the 1,728 MW Dinorwig pumped storage power plant can reach full output in 16 seconds.[4]

Gas turbine (Brayton cycle) thermal plants require around 15-30 minutes to startup. Coal thermal plants based on steam turbines (Rankine cycle) are dispatchable sources that require hours to startup.

The combined cycle power plants consist of few stages with varying startup times with more than 8 hours required to get to full power from cold state:[5]

  • the gas turbine can start in 15-30 minutes;
  • the steam turbine (ST) heating process takes from 1 hour for hot startup) to 6 hours for cold startup;
  • ST load increase takes additional 20 minutes (if "hot") to 2 hours ("cold").

Nuclear power plants have the longest startup times of few days for the cold startup (less than a week). A typical boiling water reactor goes through the following stages:[6]

  • establishment of a chain reaction (upto 6 hours);
  • getting to nominal temperatur and pressure in the reactor (12 hours);
  • warming up the steam generation (12 hours);
  • increasing the load (2-3 days).

Benefits edit

The primary benefits of dispatchable power plants include:[7]

These capabilities of dispatchable generators allow:

  • Load matching - slow changes in power demand between, for example, night and day, require changes in supply too, as the system needs to be balanced at all times (see also Electricity).
  • Peak matching - short periods of time during which demand exceeds the output of load matching plants; generation capable of satisfying these peaks in demand is implemented through quick deployment of dispatchable sources.
  • Lead-in times - periods during which an alternative source is employed to supplement the lead time required by large coal or natural gas fueled plants to reach full output; these alternative power sources can be deployed in a matter of seconds or minutes to adapt to rapid shocks in demand or supply that cannot be satisfied by peak matching generators.
  • Frequency regulation or intermittent power sources - changes in the electricity output sent into the system may change quality and stability of the transmission system itself because of a change in the frequency of electricity transmitted; renewable sources such as wind and solar are intermittent and need flexible power sources to smooth out their changes in energy production.
  • Backup for base-load generators - Nuclear power plants, for example, are equipped with nuclear reactor safety systems that can stop the generation of electricity in less than a second in case of emergency.

Alternative classification edit

A 2018 study suggested a new classification of energy generation sources, which accounts for fast increase in penetration of variable renewable energy sources, which result in high energy prices during periods of low availability:[8]

  • "Fuel saving" variable renewable energy, which have near zero variable costs and zero fuel costs by using power of wind, Sun and run-of-river hydropower. With large share of these sources, "capacity needs are driven by periods with low VRE availability" and therefore their proposed role is to replace other high-variable cost sources at periods when they are available.
  • "Fast-burst" are energy sources that can be instantly dispatched during periods of high demand and high energy prices, but are poorly performing for long term continuous operations. These include energy storage (batteries), flexible demand and demand response.
  • "Firm" low-carbon sources, which provide stable energy supply during all seasons and during periods up to weeks or months, and include nuclear power, hydro plants with large reservoirs, fossil fuels with carbon capture, geothermal and biofuels.

See also edit

References edit

  1. ^ Cooper, Duncan (22 March 2012). "Johnson's Energy Club Competes in Renewable Energy Case Competition". Samuel Curtis Johnson Graduate School of Management. Archived from the original on 16 June 2012. Retrieved 29 August 2012. Most conventional energy sources are dispatchable, meaning that they can be turned on or off according to the demand for electricity. The amount of electricity they produce can also be turned up or down so that supply of electricity matches the amount demanded by users.
  2. ^ Electricity Grid: Key Terms and Definitions
  3. ^ Global Energy Assessment: Toward a Sustainable Future
  4. ^ "Welcome to First Hydro" (PDF). Archived from the original (PDF) on 2016-03-03. Retrieved 2013-01-08.
  5. ^ Ivanova, Sauhats & Linkevics 2016, p. 2.
  6. ^ Li 2021, p. 23.
  7. ^ How can renewables deliver dispatchable power on demand?
  8. ^ Sepulveda, Nestor A.; Jenkins, Jesse D.; De Sisternes, Fernando J.; Lester, Richard K. (2018-11-21). "The Role of Firm Low-Carbon Electricity Resources in Deep Decarbonization of Power Generation". Joule. 2 (11): 2403–2420. doi:10.1016/j.joule.2018.08.006. ISSN 2542-4351.

Sources edit

  • Ivanova, Polina; Sauhats, Antans; Linkevics, Olegs (2016). Towards optimization of combined cycle power plants' start-ups and shut-down. IEEE. doi:10.1109/RTUCON.2016.7763081. ISBN 978-1-5090-3731-5.
  • Li, Yifei (2021). Characterization of the reaction time of different power plants (PDF) (M.Sc. thesis). Technische Hochschule Ingolstadt.