Japan Atomic Power Company

Summary

The Japan Atomic Power Company (日本原子力発電, Nihon Genshiryoku Hatsuden, JAPC) is a company initially formed to jump start the commercial use of nuclear power in Japan, and currently operates two different sites. According to the official web site, JAPC is "the only power company in Japan solely engaged in nuclear energy".[1]

Japan Atomic Power Company
Company typePrivate company
GenrePower Generation
Founded1957
Headquarters,
Revenue¥156,811 million (2006)
Total assets¥625,400 million
Websitewww.japc.co.jp

JAPC owns both units at the Tōkai Nuclear Power Plant and the Tsuruga Nuclear Power Plant with plans to expand at Tsuruga.

The company is jointly owned by Japan's major electric utilities: The Tokyo Electric Power Company (28.23%), Kansai Electric Power (18.54%), Chubu Electric Power (15.12%), Hokuriku Electric Power Company (13.05%), Tohoku Electric Power (6.12%), and Electric Power Development Company (J-Power) (5.37%).

Accidents edit

On 11 March 2011 several nuclear reactors in Japan were badly damaged by the 2011 Tōhoku earthquake and tsunami. The Tōkai Nuclear Power Plant lost external electric power, experienced the failure of one of its two cooling pumps, and two of its three emergency power generators. External electric power could only be restored two days after the earthquake.[2][3]

Selling uranium stock edit

In February 2013 in an attempt to raise money to be able to pay back loans due in April 2013, Japan Atomic Power did sell part of its uranium-stock. Streamlining and selling the uranium would be needed to pay back 40 billion yen. After April 2013 the major shareholders were expected to guarantee the payments for some 100 billion yen in loans. Japan Atomic Power refused to disclose the buyer.[4]

Activities abroad edit

Japan's first nuclear activity in a previously non-nuclear country will be four 1000 MW reactors at Ninh Thuận 2 Nuclear Power Plant. The feasibility study to be carried out by Japan Atomic Power Company.[5] Japan Atomic Power Company will also consult the project.[6][7] The plant will be built by a consortium, International Nuclear Energy Development of Japan Co, which comprises 13 Japanese companies.[8] The plant will be owned and operated by state-owned electricity company EVN.

Unit 1 is expected to be commissioned in 2021, unit 2 in 2022, unit 3 in 2024 and unit 4 in 2025.[5]

References edit

  1. ^ "Corporate Overview". Japan Atomic Power Company. Archived from the original on 13 November 2008. Retrieved 8 January 2008.
  2. ^ "Cooling system pump stops at Tokai No.2 plant-Kyodo; Energy & Oil; Reuters". af.reuters.com. 13 March 2011. Archived from the original on 15 March 2011. Retrieved 13 March 2011.
  3. ^ Takenaka, Kiyoshi (13 March 2011). "Tokai No.2 nuke plant cooling process working - operator | Reuters". uk.reuters.com. Retrieved 13 March 2011. Japan Atomic Power said Monday that the cooling process was working at its Tokai No.2 nuclear power plant's reactor although two of the three diesel power generators used for cooling were out of order.
  4. ^ "Japan Atomic Power takes rare step to sell uranium for loan payment". mainichi.jp. The Mainichi Newspapers Co, Ltd. 21 February 2013. Archived from the original on 6 March 2013. Retrieved 18 December 2019.
  5. ^ a b "Vietnam signs up Japan for Ninh Thuan 2". Nuclear Engineering International. 3 November 2010. Archived from the original on 7 June 2012. Retrieved 3 December 2011.
  6. ^ Peixe, Joao (1 October 2011). "Japan Offers Consultant Services for Vietnamese Nuclear Power Plant". OilPrice.com. Retrieved 3 December 2011.
  7. ^ "JAPC to assess Vietnamese project". World Nuclear News. 28 September 2011. Archived from the original on 6 December 2014. Retrieved 3 December 2011.