Line 1 (Mumbai Monorail)

Summary

Line 1 of the Mumbai Monorail is, as of 2018, the only current line in the monorail system for the city of Mumbai, India. It is also referred to as Jacob Circle-Wadala-Chembur line/corridor. Built at a cost of approximately 3,000 crore (US$380 million), the 20.21 kilometres (12.56 mi) line is fully elevated, and connects Jacob Circle in South Mumbai with Chembur in eastern Mumbai.[3] Scomi Engineering built the line with local partner Larsen & Toubro; Scomi operates Line 1 on behalf of the Mumbai Metropolitan Region Development Authority (MMRDA).[4]

Line 1
Overview
OwnerMumbai Metropolitan Region Development Authority (MMRDA)
LocaleMumbai, Maharashtra, India
Termini
Stations18
Service
TypeStraddle-beam monorail
SystemMumbai Monorail
Depot(s)Wadala Depot
Daily ridership19,000 (April 2017)[1]
Ridership13,072 (2014 weekdays)
16,699 (2014 weekends)[2]
History
Opened2 February 2014; 10 years ago (2014-02-02)
Technical
Line length19.54 km
Number of tracks2
CharacterElevated
Electrification750 V DC Third rail
Operating speed80 km/h
Route map

Legend
km
Chembur Harbour line
Chembur
Sion-Trombay Road
(VNP Marg)
VNP and RC Marg
S G Barve Marg
Fertilizer Township
Bharat Petroleum
Eastern Freeway
Freight Rail (RCF)
Mysore Colony
Bhakti Park
Wadala Depot
Services Operational from (03 Mar 2019)
GTB Nagar
Guru Tegh Bahadur Nagar Harbour line
Antop Hill
Acharya Atre Nagar
Wadala Bridge
Vadala Road Harbour line
Dadar (East)
Naigaon
Ambedkar Nagar
Mint Colony
Dr. Ambedkar Road/
Lalbaug Flyover
Lower Parel Western line
Lower Parel / Currey Road Central line
Chinchpokli Central line
Jacob Circle
Sources: Google Maps

The first phase, built at a cost of 1,100 crore (US$140 million),[5] consists of 7 stations from Chembur to Wadala Depot, and was opened to the public on 2 February 2014. The second phase consisting of 11 stations from Wadala Depot to Jacob Circle will be built at a cost of 1,900 crore (US$240 million).[6] After multiple delays it was finally opened on 3 March 2019.[7]

Line 1 is the first monorail line in India, since the Kundala Valley Railway and Patiala State Monorail Trainways were closed in the 1920s.[8][9] After the second phase was commissioned, Line 1 is the world's sixth longest monorail corridor [10]

History edit

Background edit

The then Chief Minister of Maharashtra Vilasrao Deshmukh cleared the notification for the construction of the first monorail line in Mumbai on 18 August 2008. The line would connect Jacob Circle, Wadala and Mahul via Chembur, providing a feeder service to the existing Mumbai Suburban Railway.[11]

Line 1 was implemented under the Public Private Partnership (PPP) model.[12] Four consortia pre-qualified for the contract in January 2008. They were led by Reliance Industries, Essar, IL&FS Transportation Networks and Pioneer Infratech.[13] The two consortia left in the final round were Bombardier Transportation-Reliance Energy-Hitachi Monorail, and Larsen and Toubro-Scomi Rail. On 11 November 2008, the winner was announced to be Larsen and Toubro (L&T) along with Malaysian partner Scomi. The consortium was awarded a 2,460 crore (US$310 million) contract to build and operate the monorail until 2029. Scomi's portion of the contract was approximately 785 crore (US$98 million) or 42% of the total value.[14][15] Scomi provided the design and integration for project as well as operating the monorail, while L&T was responsible for civil construction, ticketing and power supply. This was Scomi's first overseas project.[16]

Construction edit

 
Line 1 under construction in Chembur.
Picture taken: 13 July 2012
 
Line 1 under construction in Chembur.
Picture taken: 13 July 2012
 
Bridge over the Harbour line under construction at Wadala.

The foundation stone for the project was to be laid by Prime Minister Manmohan Singh on 29 November 2008, but was postponed following the 2008 Mumbai attacks.[17] Then Maharashtra Chief Minister Ashok Chavan laid the foundation stone in a ceremony at the Acres Club, Chembur on 9 February 2009.[16] The MMRDA commissioned the construction of the line in two phases. The first stretch linked Wadala with Chembur in the north-east, and the second connected Wadala with Jacob Circle in South Mumbai.[17] The original deadline for the project was April 2011.[18] The project has missed several deadlines for completion. The following months had all been announced as deadlines for the first phase - December 2010, May 2011, November 2011, May 2012, December 2012, June 2013, August 2013, 15 September 2013,[19] October 2013 and December 2013. Deadlines announced for the second phase were May 2011, December 2011, May 2012, December 2012, December 2013, June 2014, December 2014, March 2015, December 2015 and "mid-2016".[20]

A 108-meter test run was successfully conducted on 26 January 2010.[21] The first test run took place on 18 February 2012.[22] The first test of the entire 8.26 km stretch from Wadala Depot to Chembur was conducted by the MMRDA in November 2012.[18]

Opening edit

Line 1 was formally inaugurated by Prithviraj Chavan on 1 February 2014 at the Wadala Depot monorail station. After flagging off the first monorail train (a red rake, rolling stock train #7) at 3:56 pm, Chavan and other officials rode the entire route on the same train.[6][23][24][25][26] The party then proceeded to Gandhi Maidan, 15th Road, Chembur (East), where Chavan declared the monorail "open".[27] The monorail was opened to the public the following day,[28] with the first trip commencing from Wadala Depot at 7:08 am.[29] The first train from the opposite side, departed Chembur at 7:10 am[30] Services had been scheduled to operate until 3:00 pm, however, station doors were closed by 2:30 pm due to larger than expected ridership. Services were operated until 4:30 pm so that everyone with a ticket got the opportunity to ride the monorail.[31] MMRDA spokesperson Dilip Kawathkar stated, "Although stations were closed, those who were standing in queue at the ticket counters in the station area were issued tokens for traveling and as per schedule, the train operations closed at 3 pm. An announcement to this effect was made at all monorail stations."[29] The line maintained a headway of 12–13 minutes on average on opening day, although the frequency dropped to 20–30 minutes in the afternoon.[15][29] On opening day, 19,678 passengers travelled on the line. Sixty-six services were operated on the first day,[32] netting a revenue of 2.2 lakh (US$2,800) through the sale of tickets and smart cards.[29][33][34]

According to the MMRDA, between 2 February and 1 March, a total of 4,58,871 commuters used the monorail, generating a total revenue 44,66,522.[35] The average daily ridership dropped from 20,000 during the first few weeks to 15,000 by March 2014.[36][37][38] The monorail was closed for the first time on 17 March 2014 due to Holi.[39]

The decision to add escalators was taken in mid-2012.[40] Installation was scheduled to be completed by June 2014.[41] Escalators have been installed at Wadala, Chembur, Mysore Colony and Fertilizer Township.[42]

Phase 2 from Wadala Depot to Jacob Circle was inaugurated by Chief Minister Devendra Fadnavis on 2 March 2019.

Proposed future extension edit

There have been calls among several experts to extend the Mumbai Monorail Line 1 from its current southern endpoint of Jacob Circle to further east for 2 kilometers to Worli via E Moses Road and also then to extend from the current starting point of Chembur monorail station and extend by 3 km north to Ghatkopar Station via Mahul Road thereby establishing a link between two currently unconnected Transportation hubs, thereby enhancing and adding on the current usability, reach and capacity of the system.

Route description edit

The following dates represent the dates the section opened to the public, not the private inauguration.

Line 1
Extension date Termini Length Stations
2 February 2014 Chembur Wadala Depot 8.93 kilometers (5.55 mi)[43][44] 7
3 March 2019[7] Wadala Depot Jacob Circle 11.28 kilometers (7.01 mi) 10
Total Chembur Jacob Circle 19.52 kilometers (12.13 mi)[45] 17
 
Phase 1 of Line 1 on Mumbai map
Line 1
# Station Name Opening Connections
English Marathi
1 Chembur चेंबूर 2 February 2014 Chembur railway station (Harbour Line)
Line 2 (Under construction)
2 VNP and RC Marg Junction व्हीएनपी आणि आरसी मार्ग जंक्शन 2 February 2014 None
3 Fertiliser Township फर्टिलायझर टाउनशिप 2 February 2014 None
4 Bharat Petroleum भारत पेट्रोलियम 2 February 2014 None
5 Mysore Colony मैसूर कॉलनी 2 February 2014 None
6 Bhakti Park भक्ति पार्क 2 February 2014 Line 4 (Under construction)
7 Wadala Depot वडाळा आगार 2 February 2014 None
8 GTB Nagar जीटीबी नगर 3 March 2019 GTB Nagar (Harbour Line)
9 Antop Hill अँटॉप हिल 3 March 2019 None
10 Acharya Atre Nagar आचार्य अत्रे नगर 3 March 2019 None
11 Wadala Bridge वडाळा पूल 3 March 2019 Wadala Road (Harbour Line)
12 Dadar (East) दादर पूर्व 3 March 2019 None
13 Naigaon नायगाव 3 March 2019 None
14 Ambedkar Nagar अंबेडकर नगर 3 March 2019 None
15 Mint Colony टाकसाळ वसाहत 3 March 2019 None
16 Lower Parel लोअर परळ 3 March 2019 Currey Road, Central Railway,

Lower Parel, Western Railway, Mumbai Suburban Railway

17 Sant Gadge Maharaj Chowk संत गाडगे महाराज चौक 3 March 2019 Mahalaxmi (Western Line)
Line 3 (Under construction)

Infrastructure edit

Rolling stock edit

 
An ice blue monorail train.
 
A royal pink monorail train.

The monorail cars were built in Malaysia by Scomi Engineering Bhd. The first car was shipped to India on 2 January 2010.[14] Six trains currently operate in the first phase of the line. Ten more will be added in the second phase.[46]

Each monorail train consists of 4 coaches having a combined passenger capacity of 568.[47] There are roughly 18 seated and 142 standing passengers at an average of seven persons per square metre per carriage (the end cars have a different capacity due to the driving position).[48] The low number of seats was to ensure that the flow of people in and out of the coach was not hampered.[49] Handrails and handgrips are installed in coaches, within easy reach of all standing passengers. A 4-coach monorail train has a total length of 44.8 metres, and each coach weighs 15 tonnes.[50] All coaches are air-conditioned.[49] There are 2 CCTV cameras installed in each coach.[51]

To drive the monorail, train captains need to slide into the driver's seat and wait for the signal. The Vehicle Management System informs the driver of the speed, the amount of electricity being sent to each car, what the brakes are doing, the air pressure in every tyre, and the status of the doors, all in real time. Once all safety checks are completed, the driver can accelerate the train by moving a lever forward. The lever works like a throttle on an aircraft, and has two functions, forward for drive and back for brake. Trains can accelerate to 60 km/h in 23.35 seconds and 80 km/h in 41.51 seconds. Trains have disc brakes for optimum stopping power. When the lever is pulled back initially, regenerative braking is applied as the train's electric motor spins the other way and collects power rather than pushing it out. Pulling back harder on the lever, engages the disc brakes which can be used to reduce speed and bring the train to a halt. Another set of emergency disc brakes engages, in case the regular brake fails. At tight corners, the monorail banks at a six-degree angle and passes the corner without slowing down. Like all trains, the monorail also has a Dead Man's Switch, where the train's emergency brakes are applied if pressure is not maintained on the controller.[50]

Stations edit

 
Bhakti Park station as seen from street level.
 
Platform of a station.

The stations are elevated, and can be reached by staircases and escalators.[52] Each station has four escalators.[41][53] Stations do not have any public toilets.[40] Platforms at stations lack seating for commuters. Stations also lack other public conveniences such as drinking water.[54][55] MMRDA commissioner U.P.S. Madan announced on 3 March 2014 that three benches would be installed on each platform, and drinking water facility would be provided at all stations "in couple of months".[56] Personnel of the Maharashtra State Security Corporation (MSSC) are deployed at the stations.[57]

The Chembur monorail station is connected with a skywalk to the Chembur railway station.[58][59] However, the Wadala Depot station is at least 2 km away from the Wadala Road railway station.[5] Skywalks have also been constructed at Bhakti Park and Wadala, and will be constructed at Ambedkar Nagar, Lower Parel and Jacob Circle.[60]

Vehicle washing edit

Vehicle and train washing specialist Smith Bros & Webb was awarded a contract to provide Britannia Train Wash plants for the Mumbai Monorail. Smith Bros & Webb designs and manufactures its own wash equipment under the brand name of Britannia.[61]

Safety and security edit

Every station on the line is equipped with Door Frame Metal Detectors (DFMDs),[62] X-ray baggage scanners, CCTV cameras[63] and comply with NFPA (National Fire Protection Agency) 130 norms.[64] Officers in plainclothes ride the trains to curb trouble-makers, pickpockets and molesters.[63] All stations have armed security guards at all entry points,[65] and personnel of the Maharashtra State Security Corporation (MSSC) are deployed at the stations.[57] MSSC personnel are armed with outdated .410 muskets, which MSSC expects to upgrade in the future.[66] The decision to use outdated weapons was criticized by a guard, who told Mid Day that the weapon is "ineffective in a terror attack, as it reloads slowly."[67]

The doors of coaches will not open when the train is in motion.[50] Train captains receive breath analyser tests when they report for duty. Infractions are met by disciplinary action, fines, and criminal charges.[68]

Operations edit

Operator edit

Scomi Engineering built and operated the monorail line. The MMRDA paid Scomi 15.60 crore (US$2.0 million) monthly as fees for operating the line.[69] The MMRDA terminated the Scomi and L&T consortium's contract to operate the monorail on 14 December 2018 citing failure to meet contractual obligations despite several deadline extensions. Subsequently, the MMRDA assumed control over the operations and maintenance of the monorail.[70][71]

Ticketing edit

The Mumbai Monorail uses an automated fare collection system,[64] where tickets are sold in the form of electronically programmed journey tokens. Tokens are valid for 20 minutes for use at the same station, and 90 minutes for exit at any other station.[51] The minimum fare on the line is 5 and the maximum is 11.[72] A smart card costs 100 (US$1.30), of which 50 is a refundable security deposit and 50 can be used for travel.[73] Children below 90 cm height ride for free. No tourist passes are sold.[73] The MMRDA had planned to allow the purchase return tickets,[56] but initially dropped plans due to "complications".[74] However, same-day return journey tokens were introduced from October 2014.[75] They are considering offering passes for daily, monthly, and quarterly use.[76]

Fares

Fares as on 2 February 2015.[2]

Distance (km) Cost
0 - 3 5 (6.3¢ US)
3 - 5 7 (8.8¢ US)
5 - 7 9 (11¢ US)
7 - 10 11 (14¢ US)
10 - 15 14 (18¢ US)
15 - 20 15 (19¢ US)
More than 20 19 (24¢ US)

Frequency edit

Trains operate from 6 am to 10 pm, with the last service departing from both Wadala Depot and Chembur at 2207 (10:07 pm). The services are operated every 15 minutes on the line.[77] Trains have a top speed of 80 km/h, and an average speed of 65 km/h.[78] The system has been designed for a 3-minute headway with operation from 05:00 to 24:00.

Monorail services initially operated only between 7 am and 3 pm, running 64 services per day.[36][37] The MMRDA had stated that operating hours would be extended after authorities increased operations and maintenance staff, as well as studied the passenger traffic.[40] MMRDA commissioner U.P.S. Madan announced on 3 March 2014 that monorail services would operate from 7 am to 7 pm before the end of that month.[56] This was later postponed to mid-April, but plans were modified to operate the monorail in a 14-hour shift from 6 am to 8 pm. The MMRDA doubled its staff strength in order to operate the additional services.[36][37] The monorail began operating from 6 am to 8 pm, starting 15 April 2014, bringing the total number of services operating per day to 112.[79][80] Operating hours were further extended to 10 pm starting 15 August 2014,[23] increasing the number of daily services to 131.[2]

Ridership edit

On opening day, 19,678 passengers travelled on the line. Sixty-six services were operated on the first day,[32] netting a revenue of 2.2 lakh (US$2,800) through the sale of tickets and smart cards.[29][33][34] Sixty-four services were operated on the second day of operations, a frequency of one train every 7–8 minutes. Around 19,600 passengers used the monorail service, netting a revenue of 2.5 lakh (US$3,100).[15][32][81] On the second day operations, the MMRDA also announced that it had decided to install three benches on each platform.[82] The line transported 19,800 people on Day 3, operating a total of 64 trips.[83] In the first week of operations (2–8 February 2014), the monorail transported 1,36,865 passengers in about 512 trips, earning a total revenue of 14,24,810. A total of 1,32,523 tokens and 1409 smart cards were also sold during the first week.[84][85][86] Between 8–15 February 142,410 commuters travelled across the corridor in over 521 trips, earning the monorail a total revenue of 27,95,115. More than 500 smart cards were sold in the second week itself.[87][88] Ridership dropped 18% in the third week compared to the first week. About 1.12 lakh passengers made 475 trips on the monorail, earning a revenue of 10.50 lakh.[89][90] Revenues dropped by over 40% in the fourth week of operations (compared to the first week), as 92,771 rode the monorail.[91] According to the MMRDA, between 2 February and 1 March, a total of 4,58,871 commuters used the monorail, generating a total revenue 44,66,522.[35]

Over the next two weeks, 76,590 and 41,405 passengers respectively traveled on the line.[92] The average daily ridership dropped from 20,000 during the first few weeks to 15,000 by March 2014.[36] In the last full week of 8-hour operations (from 6 to 12 April), 65,760 commuters used the monorail. Services began operating for 14-hours daily, beginning 15 April 2014,[92] carrying 15,016 commuters for revenue of 1.32 lakh.[93][94][95] By the last week of January 2015, the monorail had ferried nearly 51 lakh passengers since it began operations.[42]

Consumption of food and chewing tobacco in the premises above the concourse is prohibited.[96]

According to a passenger survey by the MMRDA, 73% of the monorail commuters are regular users, commuting to their workplace or educational institute.[42] Seventy percent of commuters reached stations on foot. Commuters in the age group of 16–22 years made up 33% of the ridership, and those in the age groups of 23–30 years and 31–58 years made up 29% each.[2]

References edit

  1. ^ "Mumbai monorail: MMRDA to give contract to new operator, decides to cancel contract of Scomi Engineering".
  2. ^ a b c d "A look at the Mumbai Monorail as it completes a year". 2 February 2015.
  3. ^ Amit Chaturvedi (2 February 2014). "Mumbai monorail inaugurated by Chief Minister Prithviraj Chavan: 10-point cheatsheet". NDTV.com. Retrieved 2 February 2014.
  4. ^ "Mumbai: Monorail opens for public today". The Indian Express. 2 February 2014. Retrieved 2 February 2014.
  5. ^ a b Sukhada Tatke (26 January 2014). "Will it solve Mumbai's transport woes?". The Hindu. Retrieved 2 February 2014.
  6. ^ a b "India's first Monorail rolls out in city". The Indian Express. Retrieved 2 February 2014.
  7. ^ a b Mahale, Ajeet (4 March 2019). "MMRDA to roll out daily services on entire Monorail corridor today". The Hindu.
  8. ^ "Malaysian company says won bid to build India's first monorail". USA Today. 10 November 2008. Retrieved 17 February 2012.
  9. ^ "Mumbai monorail to run in two years". The Times of India. 27 September 2007. Retrieved 19 March 2009.
  10. ^ Ajeet Mahale (4 March 2019). "MMRDA to roll out daily services on entire Monorail corridor today". The Hindu. Retrieved 4 March 2019.
  11. ^ Devraj Dasgupta (14 August 2008). "Deshmukh makes way for 1st monorail project". Timesofindia.indiatimes.com. TNN. Retrieved 25 August 2010.
  12. ^ "Mumbai's monorail cost $450 million. So why is it losing a quarter million a month?".
  13. ^ "Financial bids for Mumbai Monorail project open". Business Standard India. Business-standard.com. Press Trust of India. 25 June 2008. Retrieved 18 March 2014.
  14. ^ a b B.K. Sidhu (2 January 2010). "Mumbai debut for Scomi rail car". Thestar.com.my. Retrieved 2 February 2014.
  15. ^ a b c "Day Two of Monorail: Heavy rush again, frequency better". The Indian Express. 6 February 2014. Retrieved 19 February 2014.
  16. ^ a b "Scomi to earn RM120m from Mumbai monorail works" (PDF). Business Times. 10 February 2009. Archived from the original (PDF) on 29 September 2013. Retrieved 25 January 2013.
  17. ^ a b "CM inaugurates the first Monorail project in Mumbai" (PDF). India Today. 10 February 2009. Archived from the original (PDF) on 29 September 2013. Retrieved 25 January 2013.
  18. ^ a b "End-to-end trial run of monorail conducted". Indian Express. 23 November 2012. Retrieved 25 January 2014.
  19. ^ DNA Correspondent (22 March 2012). "Monorail-II only by Dec 2013". DNA India. Mumbai. Retrieved 25 January 2014.
  20. ^ Ateeq Shaikh (23 January 2014). "dna special: Cheers! You can enjoy monorail ride in Mumbai by month-end". DNA. Retrieved 2 February 2014.
  21. ^ "Trial run of monorail successful in Mumbai – Oneindia News". News.oneindia.in. 26 January 2010. Retrieved 25 August 2010.
  22. ^ "Monorail takes its first ride around town". Mumbai Mirror. 19 February 2012. Retrieved 25 January 2014.
  23. ^ a b "A year on, Monorail notches up a milestone of 50 lakh riders".
  24. ^ "First mono runs crowded like the good old local". Mumbai Mirror. 1 February 2014. Retrieved 2 February 2014.
  25. ^ Ateeq Shaikh (1 February 2014). "India's first monorail flagged off by Maharashtra's Chief Minister Prithviraj Chavan". DNA. Retrieved 2 February 2014.
  26. ^ "India's first Monorail launched in Mumbai". Business Standard. 2 February 2014. Retrieved 2 February 2014.
  27. ^ "Chavan inaugurates Mumbai Monorail". Indiablooms.com. 1 February 2014. Archived from the original on 4 February 2014. Retrieved 2 February 2014.
  28. ^ "India's first monorail starts journey". The Times of India. 2 February 2014. Retrieved 2 February 2014.
  29. ^ a b c d e "Joyride begins, nearly 20K take monorail on Day One". The Indian Express. 6 February 2014. Retrieved 19 February 2014.
  30. ^ "Monorail riders thrilled at bird's eye view of Mumbai". The Times of India. 3 February 2014. Archived from the original on 5 February 2014. Retrieved 19 February 2014.
  31. ^ "20,000 ride Mumbai's monorail on Day 1". The Economic Times. 3 February 2014. Retrieved 19 February 2014.
  32. ^ a b c Ateeq Shaikh (4 February 2014). "Mumbai monorail: 19,600 have joyride on Day 2". DNA. Retrieved 19 February 2014.
  33. ^ a b "Monorail fever grips Mumbai; carries 20,000 on Day 1". DNA. 3 February 2014. Retrieved 19 February 2014.
  34. ^ a b Neha LM Tripathi (3 February 2014). "Senior citizens get bitten by monorail bug". Mid-Day. Retrieved 19 February 2014.
  35. ^ a b DNA Correspondent (3 March 2014). "30 days, 4.5l commuters in monorail". Daily News & Analysis (DNA). Retrieved 1 April 2014.
  36. ^ a b c d "Monorail to extend timings from Apr 15". The Times of India. 28 March 2014. Retrieved 1 April 2014.
  37. ^ a b c Ateeq Shaikh (28 March 2014). "dna special: Mumbai Monorail to run extra hours: 6am to 8pm". Dnaindia.com. Retrieved 1 April 2014.
  38. ^ FPJ Bureau (29 March 2014). "City roundup - Monorail to extend its operations till 8 pm". Freepressjournal.in. Retrieved 1 April 2014.
  39. ^ "Megablock, no monorail on Monday". The Times of India. 16 March 2014. Retrieved 1 April 2014.
  40. ^ a b c "Monorail ready to roll out, teething troubles remain". The Indian Express. 31 January 2014. Retrieved 2 February 2014.
  41. ^ a b "Escalators at monorail stations only by March". The Times of India. 2 January 2014. Archived from the original on 2 February 2014. Retrieved 2 February 2014.
  42. ^ a b c "Mono ferries 51 lakh people to their destination in first year of operation | Mumbai News - Times of India". The Times of India.
  43. ^ "The Mumbai Monorail Project is India's First". Forbes India Magazine. 6 February 2014. Retrieved 19 February 2014.
  44. ^ "India's First Monorail comes to Mumbai Mumbai creates history To be operational very soon". MMRDA. Retrieved 19 February 2014.
  45. ^ "Mumbai Monorail Project". MMRDA. Archived from the original on 19 February 2014. Retrieved 19 February 2014.
  46. ^ "Mumbai to flag off monorail on Feb 1". Pune Mirror. 26 January 2014. Archived from the original on 2 February 2014. Retrieved 2 February 2014.
  47. ^ Ranjeet Jadhav (2 February 2014). "All aboard! India's first monorail begins operation in Mumbai". Mid-day.com. Retrieved 2 February 2014.
  48. ^ "Mumbai's monorail: Key facts you want to know".
  49. ^ a b "In pics: Pink, blue, green - Mumbai's colourful Monorail". IBNLive. Archived from the original on 2 February 2014. Retrieved 2 February 2014.
  50. ^ a b c "Mumbai Monorail: The future is here". Autocar India. 31 January 2014. Retrieved 2 February 2014.
  51. ^ a b Anand Mishra. "In mono, tokens to serve as tickets". The Asian Age. Retrieved 2 February 2014.
  52. ^ "Mumbai celebrates world-class monorail". The Times of India. 2 February 2014. Retrieved 2 February 2014.
  53. ^ Ateeq Shaikh (2 January 2014). "No escalators at mono stations till monsoon in Mumbai". DNA. Retrieved 2 February 2014.
  54. ^ "Hop on to the first Monorail this Sunday". Mid-Day. 31 January 2014. Retrieved 2 February 2014.
  55. ^ "Mumbai monorail: Lack of water facilities and toilets upsets commuters". The Times of India. 3 February 2014. Retrieved 19 February 2014.
  56. ^ a b c "Mumbai: 12-hour monorail services, return tickets by month-end". The Times of India. 4 March 2014. Retrieved 1 April 2014.
  57. ^ a b Rahul Wadke (28 January 2014). "Mumbai monorail first phase to be ready soon | Business Line". Thehindubusinessline.com. Retrieved 2 February 2014.
  58. ^ + val.created_at +. "Mumbai monorail to be inaugurated today". NDTV.com. Retrieved 2 February 2014.
  59. ^ "All about Mumbai's monorail". Niti Central. Archived from the original on 3 February 2014. Retrieved 2 February 2014.
  60. ^ "Get set for Monorail phase 2".
  61. ^ "International Trade / Train wash specialist Smith Bros & Webb cleans up with international orders worth £2.5m". Thebusinessdesk.com. 14 February 2014. Retrieved 19 February 2014.
  62. ^ "Disaster in waiting? Your monorail ride is under threat from tankers". Mid-day.com. 15 February 2014. Retrieved 19 February 2014.
  63. ^ a b "Mumbai monorail: Bomb squads and CCTVs secure stations". The Times of India. 3 February 2014. Retrieved 19 February 2014.
  64. ^ a b "India's first monorail readies for take-off". Livemint. 29 January 2014. Retrieved 2 February 2014.
  65. ^ "Mumbai Monorail: India's First Monorail to Start Operations on Feb 1". TravelersToday. 29 January 2014. Retrieved 2 February 2014.
  66. ^ "Rs 1,100-cr Monorail guarded by guns used in revolt of 1857!". 10 May 2014.
  67. ^ "Arm Monorail guards with better firepower". 13 May 2014.
  68. ^ Ateeq Shaikh (22 October 2013). "dna exclusive: Mumbai monorail captains will be subjected to breath-analyser tests | Latest News & Updates at". Dnaindia.com. Retrieved 2 February 2014.
  69. ^ "Mumbai monorail: MMRDA to give contract to new operator, decides to cancel contract of Scomi Engineering - Mumbai Mirror -". Mumbai Mirror. Retrieved 13 April 2017.
  70. ^ "MMRDA Terminates Monorail Contract With L&T JV". BloombergQuint. Retrieved 11 January 2019.
  71. ^ Mahale, Ajeet (15 December 2018). "MMRDA takes over Monorail". The Hindu. Retrieved 11 January 2019.
  72. ^ "Monorail sees first fare hike even before inauguration". Mumbai Mirror. Retrieved 2 February 2014.
  73. ^ a b Ateeq Shaikh (22 October 2013). "Mumbai monorail: Passengers can break rules at their own peril". DNA. Retrieved 2 February 2014.
  74. ^ "Pass system likely on Mumbai monorail: No return ticket, but pass system likely on Mumbai monorail | Mumbai News - Times of India". The Times of India.
  75. ^ "Mumbai: MMRDA introduces return tickets for Monorail commuters". 27 October 2014.
  76. ^ "Monorail options: Queue up twice or buy costly pass".
  77. ^ "Mumbai's monorail operation times set to extend from tomorrow".
  78. ^ Our Bureau (25 January 2014). "Mumbai monorail services to get going this Sunday | Business Line". Thehindubusinessline.com. Retrieved 2 February 2014.
  79. ^ "Mumbai monorail timings extended".
  80. ^ "Monorail to extend timings". Archived from the original on 16 April 2014. Retrieved 19 August 2023.
  81. ^ "Until Phase II starts, monorail will just be a tourist attraction". Mid-Day. 4 February 2014. Retrieved 19 February 2014.
  82. ^ "Monorail to run 12 hours from March". The Times of India. 4 February 2014. Retrieved 19 February 2014.
  83. ^ Ateeq Shaikh (5 February 2014). "Mumbai Monorail goes houseful on Day 3 too". DNA. Retrieved 19 February 2014.
  84. ^ "Mumbai monorail a hit, 136,000 use it in a week". Business Standard. 10 February 2014. Retrieved 19 February 2014.
  85. ^ Anand Mishra (10 February 2014). "1.36 lakh passengers rode Mono in a week". The Asian Age. Retrieved 19 February 2014.
  86. ^ "Monorail genuine clientele hits security hurdle". The Indian Express. 18 February 2014. Retrieved 19 February 2014.
  87. ^ "Revenue of monorail doubles in second week". The Times of India. 16 February 2014. Retrieved 19 February 2014.
  88. ^ "Monorail earns Rs 27,95,115 in first week". Mid-day.com. 16 February 2014. Retrieved 19 February 2014.
  89. ^ "Monorail users drop to 1.12 lakh in 3rd week". The Times of India. 24 February 2014. Retrieved 1 April 2014.
  90. ^ "Monorail FAILS to impress Mumbaikars: Just 3 week into operation, commuters move away from multi-crore transportation system!". daily.bhaskar.com. 24 February 2014. Retrieved 1 April 2014.
  91. ^ Anand Mishra (3 March 2014). "Monorail traffic drops by 33%, revenue by 40%". The Asian Age. Retrieved 1 April 2014.
  92. ^ a b "Extended Monorail running hours fails to pull crowd". The Indian Express. 17 April 2014.
  93. ^ "Mumbai Monorail earns over Rs 1 lakh on first day of extended run". 16 April 2014.
  94. ^ "Monorail starts 14-hour per day run". Archived from the original on 18 April 2014. Retrieved 19 August 2023.
  95. ^ "Mumbai Monorail carries more than 15,000 commuters, garners Rs 1.32 lakh on Day 1 of extended hours". 17 April 2014.
  96. ^ "Monorail monthly passes on anvil". Freepressjournal.in. 9 February 2014. Retrieved 19 February 2014.