Line 1 (Qingdao Metro)

Summary

Line 1 of Qingdao Metro (Chinese: 青岛地铁1号线) is an underground metro line in Qingdao. It crosses Jiaozhou Bay between Fenghuangdao and Tuandao stations by a cross-sea tunnel parallels with the road tunnel.

Line 1
A train leaving Taidong station
A train leaving Taidong station
Overview
StatusIn operation
OwnerGovernment of Qingdao
LocaleQingdao, Shandong Province, China
Termini
  • Wangjiagang
  • Dongguozhuang
Stations41
Service
TypeRapid transit
SystemQingdao Metro
Services1
Operator(s)Qingdao Metro Corporation
Rolling stockChinese Type B1
History
Opened24 December 2020; 3 years ago (2020-12-24)
Technical
Line length59.818 km (37.17 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

History edit

The northern section was opened on 24 December 2020 with 18 stations from Qingdao North Railway Station to Dongguozhuang. Note that section between Xingguo Road and Dongguozhuang is planned to split from line 1 to be the Phase 1 section of line 7 in the future.

The southern section from Wangjiagang to Qingdao North Railway Station opened on December 30, 2021. Xizhen station on the section is not opened.[1]

Opening timeline edit

Segment Commencement Length Station(s) Name
Qingdao North Railway Station — Dongguozhuang 24 December 2020 21.182 km (13.16 mi) 15 Phase 1 (Northern section)
Wangjiagang — Qingdao North Railway Station 30 December 2021 38.636 km (24.01 mi)[1] 26 Phase 1 (Southern section)
Xizhen 25 July 2023 - 1 Infill station

Stations edit

Station name Connections Distance
km
Location
English Chinese
Wangjiagang 王家港  6  0.400 0.400 Huangdao
China University of Petroleum 石油大学 0.983 1.383
Taihangshan Road 太行山路 0.875 2.258
Jinggangshan Road 井冈山路  13  0.813 3.071
Dingjiahe 丁家河 1.334 4.405
Xuejiadao 薛家岛 1.667 6.072
Tianmushan Road 天目山路  12  0.903 6.975
Anzi 安子 0.942 7.917
Xingangshan Road 新港山路 1.092 9.009
Nanbeitun 南北屯 1.986 10.995
Shanli 山里 2.461 13.456
Fenghuangdao 凤凰岛 1.622 15.078
Tuandao 团岛 6.729 21.807 Shinan
Xizhen 西镇 0.700 22.507
Qingdao Railway Station 青岛站  3    QDK 0.859 23.366
Zhongshan Road 中山路 1.208 24.574 Shibei
Guanxiangshan (Qingdao Municipal Hospital) 观象山(市立医院)  4  0.728 25.302
Guangrao Road 广饶路 1.214 26.516
Taidong 台东  2  1.311 27.827
Haipo Bridge (Hiser Hospital) 海泊桥(海慈医疗)  4  1.565 29.392
Xiaocunzhuang 小村庄 1.225 30.617
Beiling 北岭 1.279 31.896
Shuiqinggou 水清沟 1.538 33.434
Qingdao Central Hospital 中心医院 1.563 34.997
Shengli Bridge (Textile Valley) 胜利桥(纺织谷)  5  0.989 35.986
Anshun Road 安顺路 1.521 37.507 Licang
Qingdao North Railway Station 青岛北站  3   8   QR    QHK 1.129 38.636
Cang'an Road 沧安路 1.444 40.080
Yongnian Road 永年路 1.243 41.323
Xingguo Road 兴国路  7  [a] 1.415 42.738
Nanling 南岭 1.161 43.899
Zunyi Road 遵义路 1.465 45.364
Ruijin Road 瑞金路 1.461 46.825
Xianjiazhai (North Coach Station) 仙家寨(汽车北站) 1.383 48.208 Chengyang
Liuting 流亭  10  3.242 51.450
Fenggang Road 凤岗路 1.962 53.412
Xiaozhaizi 小寨子 1.279 54.691
Zhengyang Middle Road 正阳中路  9  1.068 55.759
Qingdao Agricultural University 农业大学   Qingdao Chengyang Tram 1.083 56.842
Goucha 沟岔  15  1.613 58.455
Dongguozhuang 东郭庄 1.363 59.818
  1. ^ The section from Xingguo Road to Dongguozhuang is planned to be split into Line 7 once Line 7 is completed

References edit

  1. ^ a b "重磅消息!青岛地铁1号线南段12月30日12:00通车". sdchina.com. 2021-12-28. Retrieved 2022-02-15.