Nanchang Metro Line 2 (also known as Nanchang Rail Transit Line 2 in official documents) is a rapid transit line in Nanchang, from Nanlu to Xinjia'an. The line is 31.51 km in length with 28 stations.[1]
Line 2 | |
---|---|
2 | |
Overview | |
Other name(s) | Nanchang Rail Transit Line 2 |
Native name | 南昌地铁2号线 |
Status | Operational |
Locale | Nanchang, Jiangxi, China |
Termini |
|
Stations | 28 |
Service | |
Type | Rapid transit |
System | Nanchang Metro |
Depot(s) | Shengmi South Depot |
Rolling stock | 6-car Type B |
History | |
Opened | 18 August 2017 |
Technical | |
Line length | 31.52 km[1](19.6mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead catenary, 1500 V DC |
Operating speed | 80 km/h (50 mph) |
The section from Nanlu to Metro Central (19.63 km[1]) opened on 18 August 2017.[2] The section from Metro Central to Xinjia'an (11.88 km[1]) opened on 30 June 2019.[1]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Nanlu — Metro Central | 18 August 2017 | 19.63 km (12.20 mi)[1] | 17 | Phase 1 (Section 1) & Phase 2 (Southern extension) |
Metro Central — Xinjia'an | 30 June 2019 | 11.88 km (7.38 mi)[1] | 11 | Phase 1 (Section 2) |
Stations
edit
station name
Connections
Distance
km
Location
English
Chinese
Nanlu
南路
Xinjian
Dagang
大岗
Shengmi
生米
Jiulong Lake South
九龙湖南
Civic Center
市民中心
Yingtan Street
鹰潭街
International Expo Center
国博
South Square of West Railway Station
西站南广场
NXG 4
Nanchang West Railway Station
南昌西站
NXG
Longgang
龙岗
International Sports Center
国体中心
Wolongshan
卧龙山
Lingbei
岭北
Qianhu Avenue
前湖大道
Xuefu Avenue East
学府大道东
Cuiyuan Road
翠苑路
Metro Central
地铁大厦
1
Donghu / Qingshanhu / Xinjian
Yayuan Road
雅苑路
Donghu / Qingshanhu
Middle Honggu Avenue
红谷中大道
Donghu
Yangming Park
阳明公园
Qingshan Road
青山路口
3
Fuzhou Road
福州路
Bayi Square
八一广场
1
Yongshu Road
永叔路
Xihu
Dinggong Road South
丁公路南
4
Nanchang Railway Station
南昌火车站
NCG
Xihu / Qingshanhu
Shunwai
顺外
Qingshanhu
Xinjia'an
辛家庵
The line is operated with Type B rolling stock with a maximum speed of 80 km/h. 22 trains of 6-car set, 132 cars in total will be operated at the first stage. These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with a maximum capacity of 30,000 to 55,000 passengers per hour in each direction, and a minimum service interval of 2 minutes.[3]
The construction of Phase 1 started in July 2013.[4][5]
In the initial plan of 2008, Line 2 spans from Luojia Town in the east to Wangcheng (Chinese: 望城) in the west, and is 39 km in length in the long-term plan.[6] Its Phase 1 starts from Nanchang West railway station to Hongdu Zhong Dadao,[7] which was extended to Xinjia'an to the east in the end of 2010 and then extended further south to Jiulonghu in early 2013.[8][9]