Line 2 (Xiamen Metro)

Summary

Line 2 of the Xiamen Metro is a subway line in Xiamen. The line running from Wuyuanwan to Tianzhushan, has 32 stations and is 41.64 kilometres (25.87 mi) long.[2] It was opened on December 25, 2019.[1]

Line 2
Haicang Bay Park station
Overview
StatusIn operation
LocaleXiamen, Fujian, China
Termini
  • Wuyuanwan
  • Tianzhushan
Stations32 (30 in operation)
Service
TypeRapid transit
SystemXiamen Metro
History
Opened25 December 2019; 4 years ago (2019-12-25)[1]
Technical
Line length41.64 km (25.87 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Opening timeline edit

Segment Commencement Length Station(s) Name
Wuyuanwan — Tianzhushan 25 December 2019[1] 41.64 km (25.87 mi)[2] 29 Phase 1 & 2
Dongyao 26 April 2021[3] Infill station 1

Map edit

  Stations edit

Station name Connections Distance
km
Location
English Chinese
Tianzhushan 天竺山 Haicang
Dongfu 东孚
Dongyao 东瑶
Dingmei 鼎美  6 
Maluan Center 马銮中心  6 
Xinyang Avenue 新阳大道
Xin'an 新垵
Wengjiao Road 翁角路
Maqing Road 马青路
Haicang Administrative Center 海沧行政中心
Haicang Business Center 海沧商务中心
Haicang Bay Park 海沧湾公园
Cruise Center 邮轮中心 Huli
Jianye Road 建业路 Siming
Hubin Middle Road 湖滨中路
Sports Center 体育中心  3 
Yuxiu East Road 育秀东路
Lücuo 吕厝  1 
Jiangtou 江头
Houpu 后埔
Caitang 蔡塘 Xiamen BRT
Gudishi 古地石
Lingdou 岭兜
Software Park Phase II 软件园二期
Hecuo 何厝
Guanyinshan 观音山
Dongzhai 东宅 Huli
Cross-Strait Financial Center 两岸金融中心
Wutong 五通
Wetland Park 湿地公园
Zhongzhai 钟宅
Wuyuanwan 五缘湾  3 

Construction mishap edit

In mid-December 2019, construction works near the Siming District were affected by subsidence. A major water pipe burst, and dirty water flooded the construction site, affecting the concourse, platform and metro lines under construction. The subsidence also caused a collapse of the surface road and a resulting crater of approximately 500 square metres (5,400 sq ft). The cause is believed to be a burst water pipe. Water also penetrated the now-opened Lücuo station of Line 1, and flooded the concourse and platform.[4]

References edit

  1. ^ a b c "Xiàmén dìtiě 2 hào xiàn kāitōng yùnyíng shíjiān qǐdiǎn zhōngdiǎn lùxiàn zhàndiǎn tú wánzhěng bǎn" 厦门地铁2号线开通运营时间 起点终点路线站点图完整版. Mǐnnán wǎng 闽南网 (in Chinese). 2019-12-20. Archived from the original on 2019-12-20. Retrieved 2019-12-20.
  2. ^ a b c "Xiàmén dìtiě 2 hào xiàn quánxiàn "guǐ tōng"! Yùjì niándǐ qián kāitōng shì yùnyíng" 厦门地铁2号线全线"轨通"!预计年底前开通试运营. news.xmnn.cn (in Chinese). 2019-05-13.
  3. ^ "Xiàmén dìtiě 2 hào xiàn dōng yáo zhàn míng qǐ tóurù yùnyíng" 厦门地铁2号线东瑶站明起投入运营 [Xiamen Metro Line 2 Dongyao Station Will Be Put Into Operation Tomorrow]. fj.xinhuanet.com (in Chinese). 2021-04-25. Archived from the original on 2021-04-26. Retrieved 2021-04-26.
  4. ^ "2 Zhōu qián cáiguò yànshōu! Xiàmén dìtiě tū tāntā yuè tái chéng wāngyáng" 2週前才過驗收! 廈門地鐵突坍塌 月台成汪洋. news.ltn.com.tw (in Chinese). 2019-12-13. Archived from the original on 2019-12-13. Retrieved 2019-12-17.