Line 3 (Shenzhen Metro)

Summary

Shenzhen Metro Line 3 (formerly branded as Longgang line), runs northeastward from Futian Bonded Area to Shuanglong. Line 3 opened on 28 December 2010. Line 3's color is blue.[2]

Line 3
Interior of CSR Nanjing Puzhen train
Overview
Other name(s)Longgang line
(龙岗线; 龍崗線; Lónggǎng Xiàn; Lung4 Gong1 Sin3)
Native name三号线; 三號線; Sānhào Xiàn; Saam1 Hou6 Sin3
StatusOperational
LocaleShenzhen, Guangdong, China
Termini
Stations31
Color on map     Light Blue (#00a2e1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)(SZMC) Shenzhen Metro Group
Depot(s)Henggang depot
Central Park stabling yard
Rolling stockCNR Changchun (301–343) (6B)
CSR Nanjing Puzhen (344–376) (6B)
Daily ridership1 million (2018 peak)[1]
History
Opened28 December 2010; 13 years ago (2010-12-28)
Last extension28 October 2020; 3 years ago (2020-10-28)
Technical
Line length43.16 km (26.82 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (third rail)
Operating speed90 km/h (56 mph)
SignallingBombardier Cityflo 650 CBTC Moving block
Route map

Legend
Pingdi Liulian
Fuping
Pingdi Stabling Yard
Baishitang
Low Carbon City
Pingxi
Xinsheng
Liyuan
Shuanglong
Nanlian
Longcheng Square
Jixiang
Ailian
Universiade
Down arrow 16 to Xikeng
Shenhai Expressway
(ShenyangHaikou)
He'ao
Pingshan Avenue
Yonghu
Henggang
Tangkeng
Henggang Depot
Liuyue
Changshen Expressway
(ChangchunShenzhen)
Danping Expressway
Danzhutou
Dafen
Mumianwan
Buji
5 14 Shenzhen East railway station
Caopu
Shuibei
Tianbei
Cuizhu
Shaibu
1 to Luohu Right arrow
Laojie
Hongling
Tongxinling
Huaxin
Central Park Stabling Yard
10
Left arrow to Shuangyong Street
to Futian Checkpoint Right arrow
Lianhuacun
connection to Line 10
Children's Palace
Futian
2 11 Futian railway station (Guangdong)
Shopping Park
Shixia
Yitian
Futian Bonded Area

Since opening, it has been heavily trafficked and became a major transport option for urban workers. Line 3 currently has a service interval of 5 minutes between trains across the entire length of the line. Sectional trains operate on weekdays, between Huaxin and Tangkeng, from 7:15 am to 9:15 am and from 5:45 pm to 7:45 pm. This is to alleviate surges in passenger traffic at Buji, since the opening of the connecting Shenzhen East.[3]

History edit

The first phase of Shenzhen Metro Line 3 started construction in July 2007. On 23 April 2008, the Shenzhen Municipal Planning Bureau renamed the still under construction Shenzhen Metro Line 3 to "Longgang Line". The renaming was later reverted in 2013.[4]

First stage edit

The first phase of the line from Shuanglong to Caopu stations officially began operations on 28 December 2010. This section is almost entirely elevated except near Tangkeng. It starts from Longgang District and runs mainly along Shenhui Road, to Luohu District. The first phase has 16 stations, with a total length of 25.138 km (15.620 mi).

Second stage edit

The first phase (underground section) of the line from Caopu to Hongling stations and the second phase of the line from Hongling to Yitian stations, opened on 28 June 2011.

Third stage edit

The third phase of the line from Futian Bonded Area to Yitian stations, opened on 28 October 2020.

Segment Commencement Length Station(s) Name
Caopu — Shuanglong 28 December 2010 25.138 km (15.62 mi) 16 Phase 1 (elevated section)
Yitian — Caopu 28 June 2011 16.522 km (10.27 mi) 14 Phase 1 (underground section) & Phase 2
Futian Bonded Area — Yitian 28 October 2020 1.5 km (0.93 mi) 1 Phase 3

Future development edit

With the start of Shenzhen Metro's Phase IV construction, Line 3 will be extended on eastern end.

Eastern extension edit

A 9.4 km (5.8 mi) eastern extension to Pingdi Liulian station (further into Longgang District) is under construction.[5]

Long term plans edit

Long term plans include extending Line 3 even further east into neighboring Huizhou City along with Line 12. On 7 August 2013 a "Memorandum of Cooperation" was signed to coordinate transport planning and urban development between the two cities, formalizing the planning process for the proposal.[6][7]

Service routes edit

  • Futian Bonded AreaShuanglong (Before 11:00 PM)
  • HuaxinTangkeng (Working days peak hours only)
  • Some train services from Futian Bonded Area to Tangkeng (usually at peak hours and 11:00 PM to 11:30 PM).
  • Some train services from Shuanglong to Huaxin (usually at peak hours and 11:00 PM to 11:30 PM).

Stations edit

Service
routes
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Futian Bonded Area 福保 Futian
Yitian 益田 4 26 71 80 103 317 339 362 375 377 B685 B820 M347 M362 M433 M453 M500 M511 0.00 0.00
Shixia 石厦 7 28 34 73 202 303 372 B689 B957 K113 M370 M389 M390 0.95 0.95
Shopping Park 购物公园 1 3 9 64 71 235 325 327 371 373 374 379 398 B709 E1 E20 E25 K318 K359 M221 M223 M224 M441 M454 M459 Peak-time 14(高峰14) Peak-time 17(高峰17) Peak-time 95(高峰95) Sightseeing 4(观光4) 1.20 2.15
Futian 福田 2 11  GSH    NZQ 9 32 38 60 71 101 107 113 123 204 223 234 235 236 320 326 327 330/Airport 1(机场1) 374 395 398 B613 B709 E18 E28 K204 K318 K578 M221 M262 M363 M390 M413 M414 M435 M447 M448 N3 N4 N4区间 N9 Peak-express 18(高快18) Peak-express 20(高快20) Peak-time 15(高峰15) Peak-time 18(高峰18) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 58(高峰58) Peak-time 62(高峰62) Peak-time 119(高峰119) Peak-time 134(高峰134) Sightseeing 1(观光1) 0.65 2.80
Children's Palace 少年宫 4 10 34 41 46 64 65 108 111 215 383 M262 M372 M459 M488 Peak-time 123(高峰123) 1.50 4.30
Lianhuacun 莲花村 10 10 14 34 46 64 65 67 75 104 108 111 123 215 237 313 322 333 339 357 371 379 383 398 E28 K105 M204 M221 M223 M262 M347 M372 M374 M383 M389 M454 M459 M488 M500 M521 Peak-express 18(高快18) Peak-time 15(高峰15) Peak-time 21(高峰21) Peak-time 106(高峰106) Peak-time 123(高峰123) 0.75 5.05
Huaxin 华新 7 9 10 13 41 64 67 108 123 225 236 302区间 303 383 385 B622 K105 M202 M460 N6 Peak-express 4(高快4) Peak-time 119(高峰119) 1.95 7.00
Tongxinling 通新岭 6 4 8 9 10 12 13 64 65 80 108 123 202 207 225 303 375 383 393 B622 K105 M370 M389 M476 M481 N6 N17 1.00 8.00
Hongling 红岭 9 7 10 23 63 64 85 108 207 225 352 383 393 E8 E25 M360 M401 M463 N6 N10 0.75 8.75
Laojie 老街 1  17  3 10 12 14 29 59 64 85 103 104 113 203 204 211 214 215 223 302 309 336 337 351 E8 K113 M399 M402 M481 M482 N3 N4 N6 N14 Sightseeing 1(观光1) Sightseeing 2(观光2) 1.50 10.25 Luohu
Shaibu 晒布 1 3 5 11 59 64 69 82 102 103 113 203 211 306 307 309 351 369 B909 H92 M399 M402 M403 M404 M407 M408 M481 M482 M508 M509 N3 N6 N7 N16 N19 Peak-express 20(高快20) Sightseeing 2(观光2) 1.00 11.25
Cuizhu 翠竹 2 3 13 57 59 62 64 65 83 103 107 113 202 203 211 218 242 306 333 351 E11 E11区间 E12 H92 M348 M399 M407 M481 M482 M508 N2 N3 N6 U1 Airport 6(机场6) Peak-time 97(高峰97) 1.10 12.35
Tianbei 田贝 7 1 2 57 59 62 63 83 107 203 209 242 320 333 371 376 379 977 M406 M482 N2 N6 N7 N10 1.50 13.85
Shuibei 水贝 23 225 B840 1.10 14.95
Caopu 草埔 2 18 27 201 213 222 303 307 308 309 312 321 322 323 357 366 369 371 373 374 375 376 377 383 398 836 956 977 B698 E24 M203 M224 M240 M267 M269 M283 M358 M402 M403 M404 M406 M408 M414 M421 M476 M485 M511 N6 N17 N19 Peak-time 11(高峰11) Peak-time 18(高峰18) Peak-time 19(高峰19) Peak-time 32(高峰32) Shen-Hui 3A(深惠3A) Sightseeing 2(观光2) 1.60 16.55
Buji 布吉 5 14   BJQ  GS  8 85 309 321 322 323 357 366 371 372 375 376 379 383 398 839 954 977 980 E24 M203 M224 M233 M244 M265 M268 M271 M273 M283 M295 M310 M311 M358 M378 M379 M404 M406 M408 M415 M485 M511 Peak-time 79(高峰79) Peak-time 124(高峰124) Shen-Hui 3A(深惠3A) Sightseeing 2(观光2) Wutong-Hill 2(梧桐山2) 2.15 18.70 Longgang
Mumianwan 木棉湾 8 58 306 309 321 322 323 357 366 371 372 373 374 375 376 379 383 398 822 836 839 954 977 B695 M203 M224 M233 M265 M268 M271 M272 M273 M281 M283 M295 M310 M358 M378 M379 M403 M404 M406 M408 M476 M485 M508 Peak-time 17(高峰17) Peak-time 19(高峰19) Peak-time 32(高峰32) Shen-Hui 3A(深惠3A) Wutong-Hill 2(梧桐山2) 1.10 19.80
Dafen 大芬 8 309 322 323 357 366 372 373 374 380B 398 812 839 977 B695 B810 K359 M227 M233 M268 M273 M283 M295 M300 M358 M363 M378 M395 M485 M508 M511 Peak-express 20(高快20) Peak-time 17(高峰17) Peak-time 19(高峰19) Peak-time 124(高峰124) Shen-Hui 3A(深惠3A) 1.15 20.95
Danzhutou 丹竹头  17  8 9 61 309 357 366 372 379 380B 812 839 B810 B882 M227 M233 M268 M283 M295 M324 M358 M378 M485 M491 M498 Peak-express 20(高快20) Peak-time 89(高峰89) Shen-Hui 3A(深惠3A) 1.25 22.20
Liuyue 六约 61 309 351 357 366 380B 812 M229 M266 M268 M295 M309 M324 M359 M378 Peak-express 20(高快20) Shen-Hui 3(深惠3) Shen-Hui 3A(深惠3A) 3.95 26.15
Tangkeng 塘坑 309 351 357 366 380B 812 B679 B750 M266 M268 M295 M309 M359 M378 Peak-express 20(高快20) Shen-Hui 3(深惠3) Shen-Hui 3A(深惠3A) 1.35 27.50
Henggang 横岗 309 351 358 366 380A 812 B750 M266 M268 M295 M309 M359 M378 Peak-express 15(高快15) Peak-time 64(高峰64) Shen-Hui 3(深惠3) Shen-Hui 3A(深惠3A) 2.00 29.50
Yonghu 永湖 309 351 358 366 380A 812 906 B679 M266 M268 M295 M314 M357 M359 M394 M466 Peak-time 64(高峰64) Shen-Hui 3(深惠3) Shen-Hui 3A(深惠3A) 1.50 31.00
He'ao 荷坳 309 351 358 366 380A 812 833 M229 M266 M268 M294 M314 M357 M359 M368 M386 M394 M466 Dapeng-holiday 1(大鹏假日1) Shen-Hui 3A(深惠3A) 1.70 32.70
Universiade 大运 14 16 309 330B 351 358 366 380A 812 833 868 868区间1 923 B852 E21 E23 M229 M266 M268 M294 M303 M314 M316 M317 M318 M322 M357 M359 M367 M368 M386 M446 M466 T1 T2A Dapeng-holiday 1(大鹏假日1) Shen-Hui 3A(深惠3A) 1.45 34.15
Ailian 爱联 309 330B 358 366 380A 811 812 833 868 868区间1 E23 M266 M268 M278 M319 M320 M322 M359 T1 T2A Dapeng-holiday 1(大鹏假日1) Shen-Hui 3A(深惠3A) 1.50 35.65
Jixiang 吉祥 309 330B 358 366 380A 811 812 833 868 868区间1 M266 M268 M275 M278 M319 M320 M359 M367 M502 T1 T2A Dapeng-holiday 1(大鹏假日1) Shen-Hui 2支(深惠2支) Shen-Hui 3A(深惠3A) 1.70 37.35
Longcheng Square 龙城广场 309 351 365 366 380A 811 812 818 818大站快 839 862 868 868区间1 929 B723 B751 E6 E7 E21 E23 E25 E27 M220 M230 M266 M268 M275 M303 M306 M315 M359 M361 M367 M431 M447 M502 T1 Dapeng-holiday 1(大鹏假日1) Dapeng-holiday 12(大鹏假日12) Shen-Hui 3A(深惠3A) 1.35 38.70
Nanlian 南联 309 351 365 366 380A 811 812 818 818大站快 839 868 868区间1 B669 E6 E27 M220 M266 M268 M275 M303 M305 M308 M315 M317 M359 M361 M394 M431 M447 M452 T1 Dapeng-holiday 1(大鹏假日1) Shen-Hui 1(深惠1) Shen-Hui 3A(深惠3A) 1.25 39.95
Shuanglong 双龙 16 309 351 365 366 380A 810 811 812 818 818大站快 839 862 862区间 868 868区间1 B669 E6 E7 E21 E23 E25 M230 M266 M268 M275 M276 M277 M278 M280 M304 M305 M307 M308 M316 M359 M361 M386 M431 M447 M497 T1 Dapeng-holiday 1(大鹏假日1) Dapeng-holiday 12(大鹏假日12) Shen-Hui 1(深惠1) Shen-Hui 2(深惠2) Shen-Hui 2支(深惠2支) Shen-Hui 3A(深惠3A) 1.45 41.40
Liyuan 梨园
Xinsheng 新生
Pingxi 坪西
Low Carbon City 低碳城
Baishitang 白石塘
Fuping 富坪
Pingdi Liulian 坪地六联

Rolling stock edit

Type Date of manufacture Series Sets Serial number Assembly Notes
Type B 2009–2010 B-size stock 43 0301-0343 Tc+M+M+M+M+Tc Manufactured by CNR Changchun Railway Vehicles, traction units by Hyundai Rotem (Some trains now use CRRC Times Electric traction units after have a maintenance in Changchun)
Type B 2014–2016 B-size stock 33 0344-0376 Tc+M+M+M+M+Tc Manufactured by CSR Nanjing Puzhen, traction units by Hyundai Rotem

References edit

  1. ^ "创历史新高!21日深圳地铁总客流量达646.9万人次". stnn.cc. 2018-07-21.
  2. ^ Han Ximin. "Caopu and Yitian Village in Futian District open June 2011 Archived 2010-12-27 at the Wayback Machine." Shenzhen Daily. 24 December 2010.
  3. ^ "Sectional trains coming to Longgang Line---szdaily多媒体数字报刊平台". Archived from the original on 2014-05-21. Retrieved 2013-01-18.
  4. ^ "深圳5条地铁线路有了新名字 1号线叫"罗宝"". 深圳新闻网. Archived from the original on 2013-12-14. Retrieved 2012-11-29.
  5. ^ "『深圳』地铁四期建设规划调整编制完成". 2019-08-07.
  6. ^ 深圳地铁3号线12号线延至惠州]. Shenzhen Evening News. 2013-08-08. Archived from the original on 2016-03-04. Retrieved 2015-10-04.
  7. ^ 尽快建成深莞惠轨道交通网络. Huizhou Post (惠州日报). 2013-08-08. Archived from the original on 2016-03-04. Retrieved 2015-10-04.