The load line, also known as Plimsoll line, indicates the legal limit to which a ship may be loaded for specific water types and temperatures in order to safely maintain buoyancy,[1] particularly with regard to the hazard of waves that may arise. The load line is a waterline that corresponds to the maximum draft of the ship, thus yet another name, load waterline.[2] Varying water temperatures will affect a ship's draft, because warm water is less dense than cold water, providing less buoyancy. In the same way, fresh water is less dense than salinated or seawater, with a similar lessening effect upon buoyancy. The rules for international load lines are defined by the International Convention on Load Lines from 1966. For inland water transport regional, national or local rules apply.
Load lines are indicated by special markings on the hull. The marking for the main load line, the summer load line, is called load line mark or Plimsoll mark (positioned amidships), the marks for other conditions are named after the condition suffixed with "load line" (e.g. winter load line).
The purpose of a load line is to ensure that a ship has sufficient freeboard (the height from the waterline to the main deck) and thus sufficient reserve buoyancy. The freeboard of commercial vessels is measured between the lowest point of the uppermost continuous deck at side and the waterline and this must not be less than the freeboard marked on the load line certificate issued to that ship. All commercial ships, other than in exceptional circumstances,[3] have a load line symbol painted amidships on each side of the ship. This symbol is also permanently marked, so that if the paint wears off it remains visible. The load line makes it easy for anyone to determine if a ship has been overloaded. The exact location of the load line is calculated and verified by a classification society and that society issues the relevant certificates. This marking was invented in 1876 by Samuel Plimsoll.
In the Middle Ages, the Venetian Republic,[4] the Republic of Genoa and the Hanseatic League required ships to show a load line. In the case of Venice this was a cross marked on the side of the ship,[5][6] and of Genoa three horizontal lines.[7]
The first 19th-century loading recommendations were introduced by Lloyd's Register in 1835, following discussions among shipowners, shippers and underwriters. Lloyd's recommended freeboards as a function of the depth of the hold (three inches per foot of depth, 250 mm/m). These recommendations, used extensively until 1880, became known as "Lloyd's Rule".
In the 1860s, after increased loss of ships due to overloading, a British MP, Samuel Plimsoll, took up the load line cause against strong opposition.[8] A Royal Commission on unseaworthy ships was established in 1872, and in 1876 the United Kingdom Merchant Shipping Act made the load line mark compulsory, although the positioning of the mark was not fixed by law until 1894. In 1906, laws were passed requiring foreign ships visiting British ports to be marked with a load line. It was not until 1930 (the 1930 Load Line Convention) that there was international agreement for universal application of load line regulations.
In 1966 the International Convention on Load Lines was concluded in London which re-examined and amended the 1930 rules. The 1966 convention has since seen amendments in 1971, 1975, 1979, 1983, 1995 and 2003, none of which has entered into force.[9]
The original "Plimsoll mark" was a circle with a horizontal line through it to show the maximum draft of a ship. Additional marks have been added over the years, allowing for different water densities and expected sea conditions.
Letters may also appear to the sides of the mark indicating the classification society that has surveyed the vessel's load line. The initials used include AB for the American Bureau of Shipping, BV for Bureau Veritas, VL for DNV GL, IR for the Indian Register of Shipping, LR for Lloyd's Register, NK for Nippon Kaiji Kyokai and RI for the Registro Italiano Navale. These letters are approximately 115 millimetres in height and 75 millimetres in width (4.5 by 3.0 in).[10] The load line length is referred to during and following load line calculations.
The letters on the load line marks have the following meanings:
TF
– tropical fresh waterF
– fresh waterT
– tropical seawaterS
– summer temperate seawaterW
– winter temperate seawaterWNA
– winter North AtlanticFor the purposes of load line marks, freshwater is considered to have a density of 1,000 kg/m3 (62 lb/cu ft) and typical seawater 1,025 kg/m3 (64 lb/cu ft). Freshwater marks make allowance for the fact that the ship will float deeper in freshwater than saltwater. A ship loaded to her fresh water mark in fresh water will float at her summer mark once she has passed into seawater at the same displacement. Similarly, if loaded to her tropical freshwater mark she will float at her tropical seawater mark once she passes into seawater.
Certain vessels are assigned timber freeboards, but before these can be assigned, certain additional conditions have to be met. One of these conditions is that the vessel must have a forecastle of at least 0.07 the length of the vessel and of not less than standard height, which is 1.8 m (5 ft 11 in) for a vessel 75 m (246 ft) or less in length and 2.3 m (7 ft 7 in) for a vessel 125 m (410 ft) or more in length with intermediate heights for intermediate lengths. A poop or raised quarterdeck is also required if the length is less than 100 m (330 ft). The letter L prefixes the load line marks to indicate a timber load line.[1] Except for the timber winter North Atlantic freeboard, the other freeboards are less than the standard freeboards. This allows these ships to carry additional timber as deck cargo, but with the facility to jettison this cargo.
The letters on the timber load line marks have the following meanings:
LTF
– timber tropical fresh waterLF
– timber fresh waterLT
– timber tropical seawaterLS
– timber summer seawaterLW
– timber winter seawaterLWNA
– timber winter North AtlanticThe summer timber load line is arrived at from the appropriate tables in the load line rules.[11]
The winter timber load line is one thirty-sixth of the summer timber load draft below the summer timber load line.
The tropical timber load line is one forty-eighth of the summer timber load draft above the summer timber load line.
The timber fresh and the tropical timber fresh load lines are calculated in a similar way to the freshwater and tropical freshwater load lines, except that the displacement used in the formula is that of the vessel at her summer timber load draft. If this cannot be ascertained, then these marks will be one forty-eighth of the timber summer draft above the timber summer and timber tropical marks, respectively.[1]
The timber winter North Atlantic load line is at the same level as the winter North Atlantic load line.
Passenger ships having spaces which are adapted for the accommodation of passengers and the carriage of cargo alternatively may have one or more additional load line marks corresponding to the subdivision drafts approved for the alternative conditions. These marks show P1 for the principal passenger condition, and P2, P3, etc., for the alternative conditions; however, in no case is any subdivision load line mark placed above the deepest load line in saltwater.[12]
At Venice, an official mark was placed on the outside of the hull, and the ship was inspected before she sailed. If the mark was found to be more than a specified depth below the water-line, the excess cargo was removed by the authorities and the owners heavily fined....Thus, we have here a foreshadowing not only of Plimsoll's Mark but of the classification of shipping.
The very first regulations appeared in Venice in 1255. They made it illegal to exceed the draught, marked on each ship by a cross. Similar provisions were to be found in Cagliari and Pisa at the same period, and also in Barcelona, in the decree issued by Iago de Aragon in 1258, and in the maritime statutes of Marseilles in 1284. The most elaborate regulations appeared in the 14th-century Genoese statutes.