Newcastle and North Shields Railway

Summary

The Newcastle & North Shields Railway opened in June 1839 from a temporary terminus in Carliol Square in Newcastle upon Tyne to North Shields. The railway was absorbed by the Newcastle & Berwick Railway in November 1844. The Newcastle & Berwick Railway was itself absorbed by the York, Newcastle and Berwick Railway, and this became part of the North Eastern Railway in 1854.

Newcastle and North Shields Railway
Ouseburn Bridge, near Newcastle, built by the Newcastle and North Shields Railway in the 1830s using laminated timber arches on masonry piers, similar to the Wiebeking system used in Paris
Overview
Dates of operation1839–1844
SuccessorNewcastle & Berwick Railway
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

Tynemouth was served from 1847 and Newcastle Central replaced the original station in 1850. In 1882 the station at Tynemouth was replaced by a through station when the line and the former Blyth and Tyne Railway line were linked. The route was electrified in 1904 as part of the Tyneside Electrics programme.

Origins edit

A railway between Newcastle and North Shields was proposed in 1830, but was opposed in Newcastle by people who feared that the city docks would lose trade to the docks in North Shields, and by people in North Shields who feared local shops would lose trade when customers could travel to Newcastle and that no-one would holiday in North Shields if they could stay in Newcastle. Of the two proposed routes one was chosen in 1835, changed the following year so Tynemouth was on the main line rather than served by a branch. To compensate landowners for the lost income from wayleaves on coal carried on the existing wagonways, a toll of 34d[a] a mile was agreed. The Newcastle and North Shields Railway (N&NSR) received Royal Assent on 21 June 1836.[2]

 
1834 Plan Newcastle to North Shields Railway etched by W Collard

After leaving the temporary terminus at Newcastle the railway passed through a short tunnel before crossing two viaducts built using laminated timber arches on masonry piers, similar to the Wiebeking system used on the Seine at Pont d'Ivry in Paris. The 918-foot (280 m) long Ouseburn Viaduct was built with five arches whereas the Willington Dene Viaduct was 1,048 feet (319 m) long and had seven arches. The railway opened on 18 June 1839 when two trains carried a total of 700 passengers on a return trip to a celebration in Tynemouth, which was interrupted by a violent thunderstorm that flooded the marquee. Public services started the next day, although Tynemouth was not served until 1847.[3]

The average speed of express trains in 1841 was 31–34 miles per hour (50–55 km/h).[4] Third-class carriages were painted light green, and the first was 20 feet 8 inches (6.30 m) long and 7 feet 9 inches (2.36 m) wide, did not have doors and carried 60 passengers. First-class carriages were painted crimson, maroon, and in one case a rich light scarlet claret edged with yellow and those for second-class passengers were light brown and vermilion.[5] The railway was absorbed by the Newcastle & Berwick Railway in November 1844, although independent operations continued until a 14+12-mile (23.3 km) line north to Morpeth opened on 1 July 1847 from a junction from Heaton.[6]

Locomotives edit

Locomotive list
Name Wheels Builder Date introduced NNSR no. NER no. Comments
St Vincent 2-2-0 Edward Bury and Company 1834 - - From Leeds & Selby Railway, 1838.
Sold to Hartlepool Dock & Railway, 1840

[7]

Wellington 2-2-2 Robert Stephenson and Company 1839 - 153? [8]
Nelson 2-2-2 R & W Hawthorn 1839 - 150? [9]
Hotspur 2-2-2 R & W Hawthorn 1839 - 150? [10]
The Light 2-4-0 R & W Hawthorn 1839 - 151? [11]
Collingwood 0-4-2 Robert Stephenson and Company 1839 - 149? [12]
Exmouth 0-4-2 R & W Hawthorn 1840 - 152? [13]
Notes
  1. NNSR = Newcastle & North Shields Railway
  2. NER = North Eastern Railway

Legacy edit

Newcastle & North Shields Railway
Legend
 
Blyth & Tyne Railway
to Whitley Bay
Tynemouth
 
 
 
Tynemouth
North Shields
 
Percy Main
 
Percy Main Junction
 
 
 
Howdon
 
 
Willington Quay
Howdon Viaduct
 
 
Point Pleasant
Wallsend
 
 
Carville
Walkergate
 
 
Walker
Tyne and Wear Metro
to St James Metro
 
 
 
 
St. Anthonys
 
 
 
Heaton
 
 
Byker
Riverside Junction
 
 
 
 
 
Manors
Carliol Square
closed 1850
 
 
 
 
Newcastle Central
 
 

The Newcastle & Berwick Railway was absorbed by the York, Newcastle & Berwick Railway, and this became part of the North Eastern Railway in 1854.[14] The temporary terminus in Newcastle was replaced by Newcastle Central station in 1850.[15] A 10 km (6 mi) loop via Walker, known as the Riverside Branch, was opened in 1879[16] and a through station (now Tynemouth Metro station) replaced the original N&NSR terminus, linking with the Blyth & Tyne Railway, in 1882.[17] The line was electrified as part of the Tyneside Electrics programme, the new trains running in passenger service from 1904.[18]

The line today edit

Services were withdrawn from the Riverside branch on 23 July 1973[19] and it now has been converted into a footpath and cycle-path known as Hadrian's Way, forming part of both the C2C cycle route (National Cycle Network route 72) and the Hadrian's Wall National Trail.

In 1982 almost all of the main route (from a point just east of Heaton to Tynemouth and beyond) was converted to form part of the Tyne and Wear Metro Yellow line.

Notes and references edit

Footnotes edit

  1. ^ A pre-decimal penny was worth in 1836 about the same as 42p in 2021.[1]

References edit

  1. ^ UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  2. ^ Allen 1974, p. 81.
  3. ^ Allen 1974, p. 82.
  4. ^ Tomlinson 1915, p. 396.
  5. ^ Tomlinson 1915, pp. 401, 403.
  6. ^ Allen 1974, pp. 83–86.
  7. ^ "North Eastern Railway & is constituents locomotives".
  8. ^ "North Eastern Railway & is constituents locomotives".
  9. ^ "North Eastern Railway & is constituents locomotives".
  10. ^ "North Eastern Railway & is constituents locomotives".
  11. ^ "North Eastern Railway & is constituents locomotives".
  12. ^ "North Eastern Railway & is constituents locomotives".
  13. ^ "North Eastern Railway & is constituents locomotives".
  14. ^ Allen 1974, pp. 83, 107.
  15. ^ Hoole 1974, p. 204.
  16. ^ Allen 1974, p. 115.
  17. ^ Hoole 1974, p. 208.
  18. ^ Hoole 1974, p. 213.
  19. ^ "Disused Statios: St Peters Station".

Sources edit

  • Allen, Cecil J. (1974) [1964]. The North Eastern Railway. Shepperton: Ian Allan. ISBN 0-7110-0495-1.
  • Hoole, K. (1974). A Regional History of the Railways of Great Britain: Volume IV The North East. David & Charles. ISBN 0715364391.
  • Tomlinson, William Weaver (1915). The North Eastern Railway: Its rise and development. Newcastle-upon-Tyne: Andrew Reid and Company.

Further reading edit

  • Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. ISBN 1-85260-508-1.
  • Whishaw, Francis (1842). The Railways of Great Britain and Ireland Practically Described and Illustrated (2nd ed.). London: John Weale. pp. 351–360. OCLC 833076248.
  • Green, B. (1 January 1846). "On the arched timber viaducts on the Newcastle and North Shields Railway". Minutes of the Proceedings. 5 (1846). Institution of Civil Engineers: 219–232. doi:10.1680/imotp.1846.24307.

External links edit