Odisha Power Generation Corporation

Summary

(Learn how and when to remove this template message)

Odisha Power Generation Corporation Limited (OPGC) is the only thermal power generating company owned by the Government of Odisha.[1] It was incorporated under the Companies Act 1956 on 14 November 1984. OPGC started as a solely owned Government Company of the state of Odisha. It owns and operates four units of power plant- 2 units of 210 MW each and 2 units of 660 MW, each totaling a generation capacity of 1740 MW of power at Ib Thermal Power Station (ITPS), Banharpali in Jharsuguda District of Odisha. The generation from these units is committed to GRIDCO on the basis of a long-term Power Purchase Agreement.

Odisha Power Generation Corporation Limited
Company typeState-owned enterprise
Public company
IndustryElectric utility
Founded1984
HeadquartersBhubaneswar, Odisha, India
Key people
Nikunja Bihari Dhal (Chairman)
Nikunja Bihari Dhal (Managing Director)
ProductsElectric power
ServicesElectricity generation
RevenueIncrease 6,231.20 million (US$78 million) (2017-18)
Number of employees
900 (2012)
Websitewww.opgc.co.in

With the divestment of 49% of the equity shares in favor of AES Corporation, in early 1999, the ownership structure of OPGC became the first of its kind in the country. Following the withdrawal of AES from OPGC in December 2020, Govt. of Odisha bought back the 49% equity held by AES through another State-owned entity Odisha Hydro Power Corporation Limited (OHPC). Thus, OPGC became a fully owned company of the Govt. of Odisha once again.

In 1990, OPGC started construction of 7 Mini Hydel Projects in different locations of Odisha for the generation of pollution-free power by utilizing canal falls to meet the increasing demand for power with major funding from MNES and IREDA. The details are as follows:

Project Name Capacity (KW) Status as of 2009
Biribati MHP 2 X 325 Under Operation
Kendupatna MHP 2 X 250 Under Operation
Andharibhangi MHP 1 X 325 Under Operation
Badanala MHP 2 X 325 Revival Proposal in Phase II
Banpur MHP 2 X 150 Revival Proposal in Phase II
Harabhangi MHP 2 X 1000 Revival Proposal in Phase III
Barboria MHP 2 X 325 Revival Proposal in Phase III

Operational highlights edit

Year Generation (MU) PLF (%) Aux. Consumption (%)
2012-13 3181.594 86.56 10.58
2013-14 2855.902 77.62 10.65
2014-15 2798.919 76.07 10.55
2015-16 3117.320 84.73 10.72
2016-17 3234.880 87.92 10.37
2017-18 2842.350 77.25 11.09
2018-19 3085.450 83.86 10.74

OPGC Expansion Project edit

On 1 March 2019 Chief Minister Naveen Patnaik inaugurated OPGC's expansion project, which consists of two units of 660 MW each (total 1320 MW), and coal mines operated by Odisha Coal and Power Ltd. (OCPL), dedicated to the coal requirement of the two new units. The contract was awarded to M/s Bharat Heavy Electricals Limited (BHEL) for the supply of Main Plant, and to M/s BGRE for balance of plant.

75% of power to be generated from the capacity addition has been tied up with GRIDCO under a long term power purchase agreement. Financing agreement executed with Power Finance Corporation and Rural Electrification Corporation for the financing of 75% debt. Two captive coal mines (namely Manoharpur and Dip-side of Manoharpur) allocated to Odisha Coal and Power Limited for the supply of coal to OPGC are in an advanced stage of development, along with the dedicated railway line (MGR) of 47 km for transporting the coal from the mine to the power plant. The land acquisition process for railway line and coal mine have been significantly advanced and the Stage-1 clearance has been obtained from the Ministry of Environment and Forest, Government of India for Forest Diversion for coal mine and MGR alignment.

The power plant will depend on coal from the captive coal mine allocated to Odisha Coal and Power Limited. The Coal from the coal mines of Odisha Coal and Power Limited shall be transported through the dedicated railway line to OPGC for commissioning and operation of the expansion power project thereafter.

In addition to Units 3&4, based on the coal reserves available from the captive mines, OPGC is in a position to pursue Units 5&6 of 2x660 MW (1320 MW) at the same location, which is proposed to be pursued after awarding for the commencement of construction is placed for units 3&4.

References edit

  1. ^ "Department of Energy". Archived from the original on 3 June 2013. Retrieved 21 August 2012. Archived 3 June 2013 at the Wayback Machine

External links edit

  • Official website