Pertamina Energy Tower was a 99-storey, 523-metre (1,716 ft) proposed skyscraper in Jakarta, Indonesia.[2] It was designed and planned by Skidmore, Owings & Merrill LLP (SOM),[3] a private architecture and engineering company, and it was supposed to be the new HQ of the state-owned energy company Pertamina.
Pertamina Energy Tower | |
---|---|
General information | |
Status | Proposed |
Type | Office, observation, energy |
Location | Kav. Rasuna Off Park (ROP) Unit XO-02, JL. HR. Rasuna Said -, South Jakarta, Indonesia |
Coordinates | 6°12′56″S 106°49′47″E / 6.2155350°S 106.8296520°E |
Groundbreaking | August 24th 2024 (before an the l will be restaring soon construction) |
Construction started | April 27, 2025 |
Completed | December 31, 2030 (before New Year's Day January 1th 2031) |
Height | |
Architectural | 523 metres (1,716 ft)[1] |
Tip | 523 metres (1,716 ft)[1] |
Top floor | 515 metres (1,690 ft) |
Technical details | |
Floor count | 99 |
Floor area | 495,000 m2 (5,328,100 sq ft) |
Design and construction | |
Architect(s) | Skidmore, Owings & Merrill LLP (SOM)[1] |
Structural engineer | Skidmore, Owings & Merrill LLP (SOM)[1] |
The tower was proposed to have a dual structural system composed of a central reinforced concrete core and a perimeter composite moment frame. The two systems are connected at regular intervals along the height using steel outrigger and belt trusses.[4]
On 20 February 2015, Pertamina Finance Director Arief Budiman, confirmed that further construction of the Pertamina Energy Tower was suspended due to "depressed oil prices."[5]
CNN reported in 19 April 2016 that a scaled-down 30-storey tower (instead of the original 99 storey) will be restarted by a local state-owned bank PT Bank Negara Indonesia Tbk (BNI).[6]