West Isle Line, Inc.

Summary

The West Isle Line (reporting mark WFS) is a private railroad and is a wholly owned subsidiary of Nutrien (formerly Western Farm Service). The line is operated by a contractor and the line does not have any employees. The line began service on January 7, 1998, after having been acquired from the Burlington Northern & Santa Fe Railway. The line runs for 5.25 miles from Alpaugh, California, to a connection with the BNSF Railway at Stoil (milepost 936 on BNSF's Bakersfield Subdivision). Western Farm Service is the only customer on the line.

West Isle Line
Overview
HeadquartersAlpaugh, California
Reporting markWFS
LocaleSan Joaquin Valley (Tulare County), California
Dates of operationJanuary 7, 1998–present
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

Western Farm Service bought the line from the BNSF in order to avoid having the BNSF's "Alpaugh Branch" abandoned. The line was formerly part of the Atchison, Topeka and Santa Fe Railway and was constructed by the ATSF in 1914.[1]

The railroad, as of 2001, averages 400 carloads per year, primarily chemicals used for fertilizer.

Motive power edit

The West Isle Line has one EMD GP9 (serial number 21332) that was manufactured in February 1956 for Southern Pacific Railroad. It is marked in a green paint scheme with yellow marking as "West Isle Line" engine number "3399". It was formerly known as SP 3399, 3472, and 5639.[1]

See also edit

List of California railroads

References edit

  1. ^ "The Promise of Allensworth". historynet.com. Archived from the original on 2005-01-02.

External links edit

  • Railroad Retirement Board determines West Isle Line is a private railroad
  • Picture of West Isle Line Engine #3399
  • BNSF Profile of WFS