Westpark Tollway

Summary

The Westpark Tollway, also Fort Bend Westpark Tollway, is a controlled-access toll road in Texas, serving western Houston and Harris County, and northeastern Fort Bend County. Construction on the facility began in 2001 and portions of the road were opened to traffic in May 2004. Construction of the roadway was completed in August 2005. The Westpark Tollway begins on Westpark Drive just past the South Rice Avenue intersection in the Uptown District of Houston and runs approximately 22 miles (35 km) west to Farm to Market Road 1093 just past Farm to Market Road 723 (Spring Green Boulevard) in Fulshear, Texas. It runs roughly parallel and to the south of Westheimer Road (FM 1093) in Harris County and concurrently with FM 1093 in Fort Bend County.

Westpark Tollway marker Westpark Tollway marker

Westpark Tollway

Fort Bend Westpark Tollway
Map
Westpark Tollway highlighted in red
Route information
Maintained by Fort Bend County Toll Road Authority and Harris County Toll Road Authority
Length20 mi (32 km)
Existed2004–present
Major junctions
West end FM 1093
Major intersections SH 99
SH 6

Beltway 8 / Sam Houston Tollway

I-69 / US 59
East endWestpark Drive, Post Oak Boulevard
Location
CountryUnited States
StateTexas
Highway system

The Harris County Toll Road Authority (HCTRA) and the Fort Bend County Toll Road Authority (FBCTRA) operate the Westpark Tollway jointly. The 14-mile (23 km) HCTRA section is simply named Westpark Tollway; however, the 8-mile (12 km) section of the toll road operated by the FBCTRA is named Fort Bend Westpark Tollway.

There are three major interchanges in between: the Southwest Freeway (I-69)/(US 59), the West Sam Houston Tollway (Beltway 8), and Grand Parkway (State Highway 99), along with several minor interchanges. The namesake of the tollway is Westpark Drive—an east–west major arterial running through a mostly industrial area. Like other toll roads in the Houston area, the speed limit is 65 mph (105 km/h)—even inside Beltway 8.

The Westpark Tollway is the first fully electronic toll road in the United States. There are no tollbooths or toll collectors along either section of the route. The only way to legally drive on the road is by using a transponder unit attached to a vehicle's windshield (either HCTRA's EZ TAG, NTTA's TollTag, TxTAG, PikePass from Oklahoma Turnpike Authority, or K-Tag from Kansas Turnpike Authority). These transponders communicate with overhead sensors to deduct tolls from the user's toll account.

Fort Bend County Section edit

The Fort Bend section ties into the HCTRA portion of the tollway and is operated by the Fort Bend County Toll Road Authority (FBCTRA), under the alias of the Fort Bend Westpark Tollway. The project, completed on August 10, 2005, improves auto mobility for residents in northeastern Fort Bend County by creating a new east–west corridor with access to State Highway 6, Sam Houston Tollway (Beltway 8), I-69/US 59, and the Uptown District of Houston.

The Fort Bend section of the Westpark Tollway is patrolled by Fort Bend County Constable, Precinct 4. Additional coverage is provided by the Fort Bend County Sheriff's Department or other agencies as needed.[1]

Future Segments edit

Parallel to the Fort Bend Westpark Tollway, FM 1093 has been widened by Texas Department of Transportation (TxDOT) to four lanes. FM 1093 at this location serves as a toll-free frontage road for the tollway. The Fort Bend Westpark Tollway will add an additional four lanes to this effort—resulting in an eight-lane road. TxDOT is funding construction of the tollway interchanges at State Highway 99 and FM 1464.

Additionally, a 2012 expansion plan shows a Westpark Tollway addition to the city of Fulshear, Texas. The expansion promises a connection with the future Fulshear Parkway, and additional direct connection flyovers with SH-99.[2][3][4] Construction of phase one to extend Westpark Tollway from the Grand Parkway to just west of Spring Green Boulevard began in February 2016 and was finished in November 2017. From 2017 to 2020, FM 1093 was expanded from two to four lanes from the Grand Parkway to James Lane near Fulshear; the highway will serve as frontage roads for future extensions of the Westpark Tollway.[5]

Harris County Section edit

The Harris County portion of the tollway right-of-way was acquired by HCTRA from METRO, which had previously purchased the entire railroad right-of-way from Southern Pacific in 1992.

The Westpark corridor has a storied history as a transportation possibility. Originally on the books in the 1950s as the location of what is now Interstate 69/U.S. Highway 59 (Southwest Freeway) before developers lured it south to serve Sharpstown, the Westpark corridor has seen several transportation plans. The first time a toll road was mentioned was in a 1979 survey of several routes by the Texas Turnpike Authority, leading to the construction of the Hardy Toll Road in Northern Harris County by HCTRA. A heavy rail line along the corridor was floated in the 1980s, but failed to win voter approval, along with a monorail that was ended with Mayor Kathy Whitmire in 1991. Another commuter rail idea ended as METRO purchased the corridor and planned to run trains, but reversed itself and floated plans for a reversible high occupancy vehicle and bus transit lane to supplement the Southwest Freeway, tearing out the tracks in the mid 1990s. In 1999, HCTRA and METRO reached an agreement for half of the 100-foot (30 m) right-of-way to go towards a toll road run by HCTRA and the other half for use by METRO for light rail. [1] Whether or not it will be the main corridor for the University Line is a contentious issue - Richmond Avenue, to the north, emerged as another option under consideration, along with the fact that Westpark Drive and its corresponding railroad right-of-way do not intersect METRORail at any point, much less Wheeler Station, which was chosen as the junction between the lines. As of 2006, a final corridor has not been chosen. As of 2014, a combination of Westpark and Richmond has been chosen as the University Line (METRORail), but the city has not allocated money for the project.[6]

Exit list edit

CountyLocationmikmDestinationsNotes
Fort Bend 
 
FM 1093 west (Westheimer Road)
Westbound exit and eastbound entrance
  FM 723 (Spring Green Boulevard)Westbound exit and eastbound entrance
Katy Gaston Toll Plaza[7]
Electronic toll tags only, cash and pay-by-mail not allowed
Katy-Gaston RoadWestbound exit and eastbound entrance
 
 
SH 99 north (Grand Parkway)
Future direct ramps to northbound Grand Parkway from eastbound and westbound Westpark Tollway[8]
  SH 99 (Grand Parkway)Northern terminus of FBCTRA's Grand Parkway Toll Road
Peek RoadWestbound exit and eastbound entrance
Peek Toll Plaza[7]
Electronic toll tags only, cash and pay-by-mail not allowed
Mason Road / Grand Mission BoulevardNo westbound entrance
Westmoor Toll Plaza[7]
Electronic toll tags only, cash and pay-by-mail not allowed
Grand Mission BoulevardWestbound exit and eastbound entrance
    SH 6 / FM 1093 / FM 1464 / Barker Cypress Road / Westheimer Road
Fort BendHarris
county line
 
 
Westpark Tollway begins
Eastern terminus of FBCTRA's Fort Bend Westpark Tollway;
western terminus of HCTRA's Westpark Tollway
HarrisWestpark DriveWestbound exit and eastbound entrance
 
 
SH 6 north
Westbound exit and westbound entrance
 
 
 
To SH 6 south / Eldridge Parkway / Synott Rd
Westbound exit and eastbound entrance
Cook RoadEastbound exit only
West Houston Center Boulevard / Dairy Ashford Road / Cook RoadWestbound exit and eastbound entrance
Wilcrest Mainlane Toll Plaza[9]
Electronic toll tags only, cash and pay-by-mail not allowed
   Beltway 8 (Frontage Road) / Sam Houston TollwayIncludes direct ramp from eastbound Westpark Tollway to southbound Sam Houston Tollway
Gessner RoadNo westbound exit
Fondren Road / Gessner Road / Hillcroft AvenueNo westbound entrance
Fondren Mainlane Toll Plaza[9]
Electronic toll tags only, cash and pay-by-mail not allowed
 
 
 
 
I-69 north / US 59 north - Downtown
Eastbound exit and westbound entrance; eastbound entrance from I-69/US 59 northbound; westbound entrance from I-69/US 59 southbound, exit 121B; I-69 does not appear on exit signage
 
 
 
Westpark Drive to I-610 south
Eastbound exit and westbound entrance
 
 
 
Post Oak Boulevard / Richmond Avenue to I-610 north
No access from mainlanes
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

External links edit

Template:Attached KML/Westpark Tollway
KML is from Wikidata
  1. ^ FBCTRA Question and Answer page
  2. ^ "Westpark Tollway". West Houston Association. Retrieved November 20, 2014.
  3. ^ FBCTRA
  4. ^ "WestHouston.org graphic indicating future construction". Archived from the original (JPG) on 2013-11-03.
  5. ^ FM 1093 project continues with tollway study plans Community IMPACT Newspaper. 17 April 2019 (Retrieved 9 August 2020)
  6. ^ "University Line Landing Page".
  7. ^ a b c "Toll Roads".
  8. ^ Fort Bend Commissioners Court OKs joint agreement to build connector roads from Westpark Tollway to Grand Parkway Community IMPACT Newspaper. 26 November 2019 (Retrieved 9 August 2020)
  9. ^ a b "Unknown".[permanent dead link]
  • Fort Bend County Toll Road Authority
  • Harris County Toll Road Authority