Xiamen Metro, officially branded as AMTR[1][2] (Amoy Transit Rail,[3] formerly Across Mass Transit Railway[4]), is a rapid transit system serving Xiamen, Fujian, China. Line 1 began operation on 31 December 2017.[5] Line 2 began operation on 25 December 2019.[6] Line 3 began operation on 25 June 2021.
Amoy Transit Rail (AMTR) | |||
---|---|---|---|
Overview | |||
Owner | Xiamen Rail Transit Group Corporation Ltd | ||
Locale | Xiamen, Fujian Province, China | ||
Transit type | Rapid transit | ||
Number of lines | 3 (operational) 2 (under construction) 6 (proposed) | ||
Number of stations | 70 (operational) 75 (under construction) 49 (proposed) | ||
Website | www.xmgdjt.com.cn www.xmgdjt.net | ||
Operation | |||
Began operation | December 31, 2017 | ||
Operator(s) | Xiamen Rail Transit Group Corporation Ltd | ||
Technical | |||
System length | 98.4 (operational) 224 (approved) 404 (proposed) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
|
Amoy Transit Rail (AMTR) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 厦门轨道交通 | ||||||||||
Traditional Chinese | 廈門軌道交通 | ||||||||||
Literal meaning | Amoy Transit Rail | ||||||||||
| |||||||||||
Commonly abbreviated as | |||||||||||
Simplified Chinese | 厦门地铁 | ||||||||||
Traditional Chinese | 廈門地鐵 | ||||||||||
Literal meaning | Xiamen Metro | ||||||||||
|
Planning for a metro system began in the early 2000s in the meantime the mostly elevated Xiamen BRT opened in 2008. The initial phase of construction of the metro system was compiled as the Xiamen Urban Rail Transit Construction Plan (2011–2020) on 24 December 2010 and was approved by the National Development and Reform Commission on 11 May 2012.[7][8] The construction started on 13 November 2013.[9] Xiamen Urban Rail Transit Group was founded for the purpose of construction and operation. On 8 October 2016, the National Development and Reform Commission approved phase II of the Xiamen Urban Rail Transit Construction Plan (2016–2022).
The approved phase I of system development includes three lines (1, 2, 3) with 62 stations, 75.3 kilometres (46.8 mi) in length. The construction cost is projected to be 50.37 billion yuan.[10][11]
The approved phase II of system development includes four lines (2 Phase II, 3 Phase II, 4, 6) with 67 stations, 152.2 kilometres (94.6 mi) in length. The construction cost is projected to be 100.092 billion yuan.[12][13]
The approved phase II of system adjustment includes Lines 3 Phase III, which will be extended further south by 4 stations, 7.35 kilometres (4.57 mi) in length. The construction cost is projected to be 5.769 billion yuan.[14]
In addition, an intercity railway system consisting of two lines (Quanzhou–Xiamen–Zhangzhou and Zhangzhou–Gangwei–Xiamen) and 263 kilometres (163 mi) in length was also approved.[15][16]
Line | Terminals (District) |
Commencement | Newest extension |
Length km |
Stations | |
---|---|---|---|---|---|---|
1 | Zhenhai Road (Siming) |
Yannei (Jimei) |
31 December 2017 | — | 30.30 | 24 |
2 | Tianzhushan (Haicang) |
Wuyuanwan (Huli) |
25 December 2019 | — | 41.64[17] | 32 |
3 | Xiamen Railway Station (Siming) |
Caicuo (Xiang'an) |
25 June 2021 | — | 26.5[18][19] | 21 |
Line 1, with 24 stations, 30.3 kilometres (18.8 mi) length, 50 min duration of trip and 20.39 billion yuan cost of construction, was opened on 31 December 2017.[5] The line goes from south to north. The depot is situated at the northern end and is Xiamen Metro's principal depot. The line goes through Xiamen North railway station and connects the island (with 9 stations) and mainland (with 14 stations) parts of the city through a dam (with 1 station). Route: Lundu Ferry Terminal, Old Town, Jimei New Town, Xiamen North Railway Station. Line 1's color is orange. Line 1 uses six car CRRC Tangshan rolling stock.
Line 2 is 41.64 kilometres (25.87 mi)[17] in length with 32 stations.[20][21] It was opened on 25 December 2019.[6] It runs from east to west through Xiamen Island and then through Haicang channel to the mainland.
Line 3 will be 45.01 kilometres (27.97 mi) in length with 31 stations, and 26.5 kilometres (16.5 mi)[18][19] in length with 16 stations was opened on 25 June 2021. It serves the Xiamen Island from southwest to northeast then cross to the mainland and head towards Xiamen's new Xiang'an Airport.[22]
Line 4 will be 69.6 kilometres (43.2 mi) in length with 18 stations and is scheduled to be complete by 2020.[23][24] Unlike other lines, which are radial lines that connect Xiamen island to the mainland, this line is a tangential express line running strictly on the mainland around Xiamen Island. It will connect Xiamen's new Xiang'an Airport to Xiamen North railway station.
Line 6 will be 46.17 kilometres (28.69 mi) in length with 27 stations and is scheduled to be complete by 2022. Like Line 4, it is a tangential line running strictly on the mainland north of Xiamen Island.[25]
The total length of Line 9 is 44.2 kilometers, and runs completely underground. There are 24 stations, including 10 transfer stations, with an average station spacing of 1.91 kilometers.[26][27][28]
Xiamen city government plans to build an urban-suburban metro network comprising twelve lines, 493 kilometres (306 mi) in length, with 188 stations.[29] Lines 3 and Line 6 will be extended further south by 4 stations, 7.8 kilometres (4.8 mi) length and further north by 7 stations, 9.99 kilometres (6.21 mi) length. Line 10 with 31 stations and 40.4 kilometres (25.1 mi) length will be reconstructed mainly from the BRT line. Line 5 will have 27 stations and 41.6 kilometres (25.8 mi) length. Line 5 counts 29 stations and 41.28 kilometres (25.65 mi) length. Like Line 1, Line 4 and Line 10 will intersect at the new main Xiamen North railway station in Jimei District.[30] In addition, there are plans to connect the Xiamen Metro with neighboring cities of Zhangzhou and Quanzhou using a new express subway Line R1.[31][32] The plans were approved in 2015 by the NDRC[33]